BridgeWave SLE100 Installation, Equipment Unpacking, Equipment Inventory, Qty Description

Page 12

TM

SLE100 Installation Manual

3 Installation

3.1 Equipment Unpacking

The radio system equipment will arrive in two boxes: one box for the low-band radio and one box for the high-band radio. Locate the desired box (low-band or high-band) before beginning installation by checking the label on the outside of the box or on the radio itself. It is recommended that the shipping cartons and packing materials be retained in the event that it is necessary to return any equipment.

Unpacked radios can be identified by the color of their labels found on their front faces or inside the unit after removing the plastic back weather cover. The blue color label indicates a high band radio and the red color label indicates a low band radio. See Figure 3-8for further details.

Avoid applying force to the antenna radome, since this may damage the internal feed horn. Never rest the unit on a surface with the radome facing down.

Radome

3.2 Equipment Inventory

Each carton is accompanied by a packing list. Verify the contents of the carton against the packing list. The following are inventory lists for a typical system.

Qty Description

2 ea. SLE100 radios (1 low-band & 1 high-band)

2 ea. Wall Mount Kits

2 ea. Pole Mount Kits (required only when mounting the radio onto a pole)

2 ea. Visual Alignment Tool (VAT)

2 ea. Standard Power Supply (Indoor rated, 100-240VAC input to 48VDC output)

7

590-00532, rev A

Image 12
Contents SLE100 Fast Ethernet Links Copyright Notice & Disclaimer Export ControlProduct Compatibility Safety Equipment Precautions Regulatory InformationTable of Contents Introduction Purpose of ManualPrior Knowledge Technical Assistance and Customer Service Return Material Authorization RMAContact Information BridgeWave SalesEquipment Checklist Site PlanningGeneral Line of Sight LOSAntenna Location CablingCabling Diagram Grounding & LightningEnvironmental Installation Equipment UnpackingEquipment Inventory Qty DescriptionDescription Qty Installation Tools Radio Mount Installation Wall Mounting InstructionsAttaching the Yoke to the Mounting Bracket Wall Mount Hole Drilling Template Pole-Mount Bracket Assembly Pole Mounting InstructionsAttaching Pole Mount Brackets to Wall Mount Bracket Attaching Pole Mount Brackets and Yoke to Pole Radio Installation Polarization Diamond OrientationsAttaching the Radio to the Yoke Perform steps 1 -3 on both ends of the link Cable Installation SLE100 Installation Manual Optional Ice Shield Canopy Installation IntroductionInstallation Instructions Optional KitAttaching the Ice Shield Re-install the O bolt Antenna Alignment Ig h t MirrorWrong Qual & RSL Test Cable 11 RSL & Qual Test Leads12 RSL and Quality Test Cable Connection Point 14 Radio Link Up and Power LED’s Configuring Network Equipment Network Port StatisticsAppendix a Troubleshooting Problem Possible Cause ResolutionSLE100 Installation Manual Appendix B RSL Voltage vs. Distance Std. Limited Warranty & SW License Limited Hardware WarrantyLimitation of Remedy and Liability Provisions