BridgeWave SLE100 installation manual Wrong

Page 31

TM

SLE100 Installation Manual

Radio at far end of link

Aiming Too low

Wrong

6.Verify Link Up LED’s are lit solid on both radios.

7.Slightly rotate each radio up/down and left/right to find the maximum RSL voltage reading. [Note that the width of the center beam is only 1.4 degrees and the first side-lobe beam is only 2.5 degrees off from center.] Set the radio in the position that results in the highest RSL voltage reading. See Section 3.9 to determine the proper use of the supplied test cable in order to read the RSL voltage.

Verify that the RSL voltage falls within the expected range based on the graph in Appendix B.

8.Begin to tighten the mounting bolts. It is important to tighten the bolts in the following order. First start with the bolts that control the left/right movement of the radio. These are the bolts on the yoke portion of the mount behind the radio. Start by tightening the bolt closest to the pole or wall. Once this is tightened, move to the bolt directly in front of the bolt you just tightened and slowly tighten this bolt. While tightening the bolts be careful that the radio does not move during the process. As these bolts are tightened up/down movement of the radio may occur due to the seating of the mounting bracket and radio yoke. Check the RSL voltage reading to ensure it is still at its maximum level, and adjust vertical tilt if required. Next, tighten the bolts that allow the up/down movement of the radio. First tighten the lower bolts on both sides of the yoke bracket. Once the lower bolts are tightened on both sides of the radio, tighten the upper bolts.

9.Repeat steps 1 to 8 for the peer radio.

10.Connect to the web management interface of each unit and perform an Auto-Calibration from the ‘Maintenance’ page on one end of the link at a time.

11.After both ends of the link are calibrated check the quality voltage using the test cable and a voltmeter and confirm it indicates 3.3V on each end of the link (i.e., error free).

12.Remove the VAT from the radio, replace the back plastic cover and hand tighten the back cover nut to the point where the back cover stops (i.e., when it hits the metal ring on the back metal plate). The installation is now complete.

26

590-00532, rev A

Image 31
Contents SLE100 Fast Ethernet Links Export Control Copyright Notice & DisclaimerProduct Compatibility Safety Regulatory Information Equipment PrecautionsTable of Contents Purpose of Manual IntroductionPrior Knowledge BridgeWave Sales Technical Assistance and Customer ServiceReturn Material Authorization RMA Contact InformationLine of Sight LOS Equipment ChecklistSite Planning GeneralCabling Antenna LocationGrounding & Lightning Cabling DiagramEnvironmental Qty Description InstallationEquipment Unpacking Equipment InventoryDescription Qty Installation Tools Wall Mounting Instructions Radio Mount InstallationAttaching the Yoke to the Mounting Bracket Wall Mount Hole Drilling Template Pole Mounting Instructions Pole-Mount Bracket AssemblyAttaching Pole Mount Brackets to Wall Mount Bracket Attaching Pole Mount Brackets and Yoke to Pole Polarization Diamond Orientations Radio InstallationAttaching the Radio to the Yoke Perform steps 1 -3 on both ends of the link Cable Installation SLE100 Installation Manual Introduction Optional Ice Shield Canopy InstallationOptional Kit Installation InstructionsAttaching the Ice Shield Re-install the O bolt Antenna Alignment Mirror Ig h tWrong 11 RSL & Qual Test Leads Qual & RSL Test Cable12 RSL and Quality Test Cable Connection Point 14 Radio Link Up and Power LED’s Network Port Statistics Configuring Network EquipmentProblem Possible Cause Resolution Appendix a TroubleshootingSLE100 Installation Manual Appendix B RSL Voltage vs. Distance Limited Hardware Warranty Std. Limited Warranty & SW LicenseLimitation of Remedy and Liability Provisions