Compatible Systems A00-1869, Enterprise-8 manual Moving the Unit into the Rack

Page 18

Chapter 2 - Mounting Instructions

12

Moving the Unit into the Rack

Never attempt to move the server using the RIOP card handles or the filter cover opening. They will not support the weight of the device. Use the built-in side handles and either the large mounting handles, if you have installed them, or the very bottom of the chassis to move it.

Figure 7. Moving the Unit into a Standard Equipment Rack

1.Two people are needed to move the unit into the rack. Do not attempt to move the unit by yourself. Holding the unit by the front and side handles as shown in Figure 7, care- fully lift the unit and place it into the brackets.

Figure 7.1. Moving the Unit into a Telco Rack

1.Two people are needed to move the unit into the rack. Do not attempt to move the unit by yourself. Holding the unit from the bottom and by the side handles as shown in Figure 7.1, carefully lift the unit and place it into the brackets.

Image 18
Contents IntraPort Enterprise-8 VPN Access Server Installation Guide Page Command Line Management Network InstallationCompatiView Software Installation Introduction to the IntraPort Enterprise-8LED Patterns and Test Switch Settings Basic Configuration GuideShipping Defaults Appendix a Connector and Cable Pin OutsAppendix F Terms and Conditions IiiLocation of Voltage Switch on the Power Supply IntraPort Enterprise-8 Installation Overview Introduction to the IntraPort Enterprise-8IntraPort Enterprise-8 Manual Overview Few Notes Warranty and ServiceGetting Started Please Read the ManualsAdditional Items Needed for Installation What You Will Need to Get StartedSupplied with the IntraPort Enterprise-8 Placement Considerations Safety GuidelinesMounting Instructions Changing the Power Supply Voltage Settings Parts and ToolsInstalling Mounting Ears and Handles Installing Mounting Ears for a Telco RackRack-Mount Brackets Rack-Mount BracketsRight Bracket Installation Fastening the Right Bracket to the RackLeft Bracket Installation Fastening the Left Bracket to the RackSecuring the Shelf Lowering the ShelfMoving the Unit into the Rack Moving the Unit into a Standard Equipment RackPlacing the Unit in an Equipment Rack Placing the Unit in a Standard Equipment RackSecuring the Unit to the Rack Securing the Unit to the RackNetwork Installation Physical Connection RequirementsConnecting the Server to the Ethernet Detail of Riop CardsConnecting a Management Console Powering Up the ServerPower Alarm Information CompatiView for Windows CompatiView Software InstallationInstallation and Operation System RequirementsTransport Protocols and CompatiView Command Line Management Out-of-Band Command Line ManagementSetting Up Telnet Operation IP Settings for Setups in Parallel with a Firewall Basic Configuration GuideEthernet Interface Configuration IP ProtocolIP Settings for Setups Behind a Firewall Configuring the Server for LAN-to-LAN Tunnels IPX ProtocolAppleTalk Protocol Suggested for Client Tunnel Configurations Configuring the Server for IP and IPX Client TunnelsRequired for Client Tunnel Configurations VPN User DatabaseSetting up Radius Authentication Setting the IntraPort Enterprise-8 for a Radius ServerRadius Server User Authentication Settings Setting up SecurID Authentication Setting the IntraPort Enterprise-8 for an ACE/ServerACE/Server Settings Saving a Configuration File to Flash ROM Shipping Defaults Default PasswordEthernet Interfaces IntraPort Enterprise-8 LED Patterns IntraPort Enterprise-8 Switch Settings Appendix a Connector and Cable Pin Outs Pin Outs for DB-25 Male to DB-25 Female Console CableAppendix B Downloading Software From Compatible Systems Appendix C Security Dynamics ACE/Server Information Appendix D Adding or Replacing Riop Cards Removing and Replacing an Riop Card or Cover PlateAppendix E When the Over Temp Light Comes On Replacing or Cleaning the Intraport Enterprise-8 Air FilterAppendix F Terms and Conditions Appendix F Terms and Conditions