AMCC 9550SX-8LP manual Installing the Battery Backup Unit

Page 27

Chapter 2. Installing the Battery Backup Unit

The Battery Backup Unit (BBU) is an add-on that can be attached to a 3ware 9550SX RAID controller to supply power to the memory module from an attached battery pack in the event of a system power loss. This allows the controller to use write-caching for optimal performance and not be exposed to data loss in the event of a system power failure. When fully charged, the battery preserves the contents of the controller cache memory for a limited period of time (up to 72 hours). When power is restored, cached data is flushed to disks.

Caution: Both the 3ware RAID controller and the BBU are sensitive electronic equipment and can be damaged through electrostatic discharge. When installing the BBU on the controller, be sure you are grounded. Use a grounding strap, or work on an ESD-protective mat.

„Do not remove the 3ware controller or BBU from their protective bags until you are properly grounded.

„Handle the 3ware RAID controller by its edges or by the metal bracket at its end.

„Do not touch any pin, contact, lead, or component on the 3ware RAID controller.

Important: The battery is a heat-sensitive component. The cooler the battery, the longer the battery lasts. If possible, place the controller with the BBU in a slot with good airflow, away from components that generate the most heat in the system, such as video cards.

Note: The battery will drain if it is plugged into the BBU and there is no power to the unit. Wait to plug the battery into the BBU until the system is ready for use.

www.3ware.com

23

Image 27
Contents 3ware Copyright TrademarksDisclaimer Table of Contents Appendix Technical Support Before You Begin Contents of PackageOther Documentation Installation ConsiderationsWhether to Use the LED Status Connector Safety Factors Personal SafetyWhat You Need Tools and Equipment Protecting Equipment and Data 9550SX RAID Controller Cards 9550SX 8-Port with Standard Sata Connectors9550SX 12-Port with Standard Sata Connectors 9550SX 4-Port with Standard Sata Connectors9550SX 16-Port with Multilane Internal Sata Connectors 9550SX 12-Port with Multilane Internal Sata ConnectorsTo connect Sata cables to the controller Installing a Serial ATA RAID ControllerSata Cables Being Inserted Into Port To install the controller in the computerInserting Controller Into PCI Slot To connect the Sata cables to the drives Sata Cable Connecting to DriveMultilane Serial ATA Cable InfiniBand 4x, SFF-8470 9550SX-12MIMultilane Cable Serial ATA SFF-8087 9550SX-16MLPage To install the drives LED connector details Connecting Drive Activity LED IndicatorsPort 3ware 9550SX-12 Serial ATA RAID Controller Additional Details About the LED Status Connectors LED Indicator Pin Positions Check Installation and Close the Case Configure your RAID ArraysFinishing Up Installing an Amcc 3ware 9550SX RAID Controller Installing the Battery Backup Unit Tools and equipment required Installation OverviewPoints of connection on the half-height controller Removing the head from the plastic post Installation InstructionsPress down gently until the BBU is seated If you have a 4-port or 8-port 9550SX If you have a 12-port or 16-port 9550SX Shows the BBU fully installed on 3ware controllers BBU installed on controllers Replacing the Battery Removing the battery module Removing the power cable from the BBU module Feedback on this manual Sales and ordering informationAppendix Technical Support