AMCC 9690SA manual Tools You Need, Before You Start

Page 15

Chapter 2. Installing Your 3ware RAID Controller

Tools You Need

You will need the following tools during installation:

„An ESD grounding strap or mat

„A Phillips screwdriver

Before You Start

3ware 9690SA RAID controllers can be installed in a standard enclosure or in an enclosure with a backplane.

1Be sure to read “Safety Information” on page 8 in Chapter 1.

2If you have a Battery Backup Unit (BBU), install it before proceeding. For details, see “Chapter 3. Installing a Battery Backup Unit” on page 17.

3If your enclosure is low-profile, unscrew the full height bracket from the 3ware 9690SA RAID controller and replace it with the included low-profile bracket, using the same screws.

4If appropriate, set the PM2 (power management) jumper on the disk drives, to enable staggered spinup. Check the documentation that came with your disk drives to see whether this is required.

5SATA-2 hard drives are sometimes shipped from the manufacturer with the transfer rate set to 1.5Gbps. If this is the case for your drives, you may need to remove a jumper or run a software utility to change the transfer rate to 3.0Gbps. Please check with your hard drive manufacturers documentation or website on how to set the transfer rate to 3.0Gbps.

www.3ware.com

11

Image 15
Contents 3ware 9690SA SAS/SATA RAID Controller Copyright TrademarksDisclaimer Table of Contents About this Guide Getting Started Contents of this Package9690SA RAID Controller Card Models 3ware 9690SA SAS/SATA RAID Controller Installation GuidePort 3ware 9690SA-8I Serial ATA RAID Controller Port 3ware 9690SA-8E Serial ATA RAID Controller CablesMulti-lane Cable Serial ATA SFF-8087 Other Available CablesMotherboard and Slot Requirements System RequirementsOperating System Requirements Site Selection Safety InformationProtecting Equipment and Data Installation Considerations Before You Start Tools You NeedInstall the Controller in the Computer Inserting Controller Into PCI Express Slot Attach the Cables to Your Controller External Enclosure Connection Connect the Cables to BackplanesCheck Installation and Close the Case Finishing Up the RAID Controller InstallationConfigure Your RAID Arrays Connect Battery if appropriateItems in Remote Battery Installation Package Installing a Battery Backup UnitInstalling the Control Module To install the control module BBU control module connected to the controller Installing the Remote BatteryThree locations for mounting battery on remote board Attaching the battery module to the remote board Installing the Remote Battery Replacing the Battery Removing the power cable from the BBU module 26 3ware 9690SA SAS/SATA RAID Controller Installation Guide Feedback on this manual Sales and ordering information
Related manuals
Manual 30 pages 1.85 Kb