Contents |
|
|
Quick steps |
|
|
| Getting Started |
|
1. Set up your projector | Setting up | 16 |
| Projection method | 16 |
See “Setting up” on page 16. | Removing and attaching the projection lens | 17 |
| Power cord | 18 |
Important Information
2.Connect with other devices
See the functional instructions in the
3.Prepare the Remote control See “Remote control” on page 14.
4.Start projecting
See “Projecting” on page 19.
5.Adjust the image
See “Menu Navigation” on page 24.
Important Information |
|
Important Safety Notice | 2 |
Precautions with regard to safety | 6 |
WARNINGS | 6 |
CAUTIONS | 7 |
Cautions when transporting | 9 |
Cautions when installing | 9 |
Cautions on use | 9 |
Others | 10 |
Security | 10 |
Accessories | 11 |
Preparation |
|
About Your Projector | 12 |
Projector body | 12 |
Remote control | 14 |
Basic Operation |
|
Projecting | 19 |
Projecting a image | 19 |
Remote control operation | 21 |
Operating range | 21 |
Setting up the image position automatically | 21 |
Switching the input signal | 22 |
Stopping the projection | 22 |
Clearing the screen | 22 |
Changing the picture aspect ratio | 22 |
Displaying the internal test pattern | 22 |
Using an assigned function | 23 |
Displaying the status of the projector | 23 |
Resetting to the factory default | 23 |
Menu Navigation | 24 |
Main menu and | 24 |
Navigating through the menu | 27 |
Maintenance |
|
Monitor Lamp indicators | 28 |
Managing the indicated problems | 28 |
Replacement | 30 |
Replacing the Lamp unit | 30 |
Replacing the Auto Cleaning Filter (ACF) | 31 |
Troubleshooting | 33 |
Appendix |
|
Technical Information | 34 |
List of compatible signals | 34 |
Specifications | 36 |
Dimensions | 38 |
Trademark acknowledgements | 38 |
Index | 39 |
Avis important concernant la sécurité | 41 |
Précautions de sécurité | 43 |
AVERTISSEMENT | 43 |
MISES EN GARDE | 44 |
Précautions lors du transport | 45 |
Précautions lors de l'installation | 46 |
Précautions lors de l'utilisation | 46 |
Autres | 46 |
Sécurité | 47 |
Remplacement | 48 |
Preparation
Basic Operation Getting Started
Maintenance
Appendix