INSTALLATION MANUAL | 3 |
Read Me First!
Your new Maple Systems OIT comes from the factory configured with the default communication settings: 9600 baud, no parity, 8 data bits, 1 stop bit, no handshaking, no
To ensure that the OIT meets CE compliance, it is necessary to follow all installation procedures described in this manual.
Introduction
Thank you for purchasing a Maple Systems MAP450D. You have selected a rugged, reliable, and powerful operator interface for your application. This booklet describes the steps necessary to ensure
read this booklet carefully!!
Static Awareness
| It is best NOT to remove the rear cover on the OIT except when accessing the |
| terminal block pins or panel mounting the OIT. When the rear cover is removed, |
| the circuitry inside is exposed to possible damage by electrostatic discharge during |
| handling. Minimize the possibility of electrostatic discharge by: |
CAUTION | • Discharging personal static by grounding yourself prior to handling the OIT. |
| • Handling the OIT at |
| • Connecting the chassis of the OIT to a clean ground. |
| • Placing the OIT into an |
Unpacking the Unit
Carefully unpack the OIT. Please read any instructions or cautions that appear on the shipping container. Check all material in the container against the enclosed packing list. Maple Systems, Inc., will not accept responsibility for shortages against the packing list unless notified within 30 days. The equipment and its accessories were inspected and tested by Maple Systems before shipment; all of the equipment should be in good working order. Examine the equipment carefully; if any shipping damage is evident, notify the carrier immediately. You are responsible for claim negotiations with the carrier. Save the shipping container and packing material in case the equipment needs to be stored, returned to Maple Systems, or transported for any reason.