B&B Electronics Connecting the MAP450D to a Host Controller, Host/Controller

Page 7

INSTALLATION MANUAL

7

2. Connecting the MAP450D to a Host Controller

It is necessary to follow all installation procedures described in this chapter for electrical noise immunity and CE compliance.

Host/Controller

Operating Cable

Tighten

specific for the

 

Host/Controller

 

OIT Operating

Cable

Install the ferrite coil here

OIT Power Supply

Output

Case GND

Terminal

Block

Figure 3 MAP450D Cable Connections

STEPS

1.Remove the four screws from the back of the OIT enclosure and open the two halves.

2.A strain relief is provided for wiring access and sealing. The cable must be inserted through the strain relief and into the cover.

3.Remove the black heatshrink tubing from the end of the OIT operating cable.

4.Slide the ferrite coil over the OIT operating cable. This usually requires rotating the ferrite coil back and forth while simultaneously pulling on the OIT operating cable.

5.Slide the ferrite coil up against the inside wall of the OIT enclosure and pull through enough additional cable to reconnect the OIT operating cable wires.

1010-0046A, REV 00

Image 7
Contents Installation Manual Applications Assistance Unpacking the Unit Read Me FirstIntroduction Static AwarenessTable of Contents Control Panel Design Guidelines Power Supply SelectionControl Panel Grounding Other Steps to Improve Noise Immunity OIT Cable RoutingHost/Controller Connecting the MAP450D to a Host ControllerFerrite coil RS-422/485 Interactive & Block modes RS-232 Interactive & Block modesOIT RS-422/485 Network modeOIT #2 Network Termination Cable shield must not be used as the signal ground Set Jumper for 3-Wire RS-422/485Panel Mount Mounting the MAP450DMAP450D Pedestal Mounting Pedestal/Pendent MountMounting Plate Benchtop MountConnecting the MAP450D to a PC Configuring the MAP450DMechanical Appendix a OIT Hardware SpecificationsFront View Rear View Appendix a con’t Dimensional OutlineAppendix B Differences Between MAP450D and MAP450B