Comet S31 15/20KVA
16
< 4m
300 mm
< 1m
2. Installation
Checking the indicator light (see section 1.5 "Indicator lights")
◗Put the UPS back into operation.
◗Check the status of the UPS green indicator light 10 : - on steady for 5s (status 1 in the table),
- then regular flashing every second (status 3 in the table).
◗Check the status of CD indicator light 9 :
-off for 5s,
-then regular flashing (status 3 in the table).
PowerServices TelPac is now ready for the parameter setting stage that is necessary for Teleservice.
Consult the Technical Support documentation.
Lastly, proceed to step 2 (see section 2.1 "Procedure").
34003602EN/AB - Page 25