MGE UPS Systems 100 installation manual Open the doors giving access to

Page 26

2. Installation

2.9 Installing the PowerServices TelPac external unit for Galaxy UPSs

Installation must be carried out by our technicians.

Installation of the PowerServices TelPac external unit requires UPS shut down, load tranfer to bypass and removal of three protective panels.

Refer to the UPS’s user manual to carry out shut-down procedures in full compliance with safety procedures and instructions. Non-compliance with these may lead to safety hazards for the people concerned.

Galaxy view with doors open and protective panels removed

17

18

 

 

Installation, connections

 

 

1 - Open the doors giving access to the

 

 

switch handles,

 

 

2 - Carry out the UPS shut-down procedure

 

 

and remove the three protective panels,

 

 

3 - Check:

 

 

that the UPS is equipped with at least one

 

21

GTCZ communication card 17 and one

 

 

XR11

 

RAUZ card 18 .

 

 

that a protected and UPS-secured outlet

 

 

19 is available.

 

 

4 - Configure the RAUZ and GTCZ card as

 

 

indicated in section 2.6.

1 black

19

5 - Connect the power supply adapter to the

2 brown

 

UPS-secured outlet 19 . Bring the power

4 red

20

supply cord 20 out through the grommet in

 

panel A.

 

 

XR11

 

6 - Connect, install then fix link cable 21 .

RAUZ card

 

Bring the other end of the cable out through

 

 

 

 

the grommet in panel A.

 

 

7 - Replace the protective panels.

Page 26 - 34003602EN/AB

Image 26
Contents PowerServicesTM TelPac Installation manual2 34003602EN/AB Environment Special precautionsIntroduction Recycling of packagingFederal Communication Commission FCC statement ForewordEMC compatibility Radio and Telecommunications compatibilityModem compatibility and supported countries List of countries supported by the modemPictogram symbols Contents Maintenance Unpacking and checking the contents PresentationOverview Country Teleservice Centre FunctionsRS485 Port Technical data sheetPower supply ModemStatus Red CD indicator Card version External version Indicator lightsStatus Green UPS indicator Card version External version Preliminary check InstallationProcedure Various installation types Recommendations Fitting the warning labelMGE Attention Onduleur sous Teleservice Galaxy PWGeneral Setting up the RS485 linkSingle-unit type installation UPS with JbusImpedance matching and bias settings Configuring the shielding terminal = ShieldingConfiguring the RS485 card for Comet For CometConfiguring the Rauz card for Galaxy Installing the PowerServices TelPac card ConnectionComet S31 7.5/10KVA ConnectionsComet S31 15/20KVA Open the doors giving access to Galaxy view with doors open and protective panels in place Connecting contact type inputs PowerServices TelPac card 2 inputsPowerServices TelPac external unit 2 inputs + 4 extensions 5V BComet link cable ref MaintenanceCable diagrams