Rev 1 |
| ||
5.8 | CONNECTING THE LOADS | 20 | |
5.8.1 DC Circuit Breakers | 20 | ||
5.8.2 Installation of Circuit Breakers | 21 | ||
| 5.8.2.1 | 24V Circuit Breaker Load Connections | 21 |
| 5.8.2.2 | 21 | |
5.9 | BATTERY TEMPERATURE PROBE INSTALLATION | 22 | |
5.10 | 22 | ||
5.10.1 | Apply AC Power | 23 | |
5.10.2 | System Parameters Verification/Adjustment | 23 | |
5.10.3 | Full System Power Up | 24 | |
6 SETUP, ADJUSTMENTS, AND OPERATION | 25 | ||
6.1 | USER INTERFACE | 25 | |
6.2 | SNMP INTERFACE | 26 | |
6.3 | EXTERNAL ALARM INPUTS | 26 | |
6.4 | ALARM OUTPUT RELAYS | 26 | |
6.5 | PARAMETER LOCATIONS, DESCRIPTIONS, AND DEFAULT VALUES | 27 |
v