American Power Conversion AP9312TH quick start manual Installation

Page 8

Installation

Installing

To install the Environmental Monitoring Unit outside an

outside an

enclosure, place it on a flat surface in a protected area with

enclosure

adequate air flow and minimal dust. Do not operate the unit

 

where temperature and humidity are outside the limits

 

specified on page 19.

Installing in an

To install the Environmental Monitoring Unit in a NetShelter

enclosure

enclosure or other standard (EIA-310-D) 19-inch rack:

 

1. Attach the rack-mount brackets (870-8213A and

 

870-8183) to the unit using the four flat-head screws.

2.Insert caged nuts (provided with the enclosure) on the vertical mounting rails at the location you choose for the unit-bracket assembly in the enclosure.

3.Align the assembly’s brackets with the caged nuts in Step 2.

Continued on next page

4

Image 8
Contents Environmental Monitoring Unit Page Contents Maintenance Correcting problems If problems persist Introduction Product inventory Snmp Installation Attach the assembly tightly to the enclosure using four Connection process overview Connecting dry contact devices Contact Sensors Sensor Zones Connector Pinout Pin FunctionSensors in parallel and normally closed sensors in series Example of a typical hookup Quick Configuration Through the Management Card Wizard.On next Over the Network by ARP. To configure the Environmental Through a Web browser Through TelnetWarranty Information Possibility of such damageTroubleshooting Problem Possible Cause SolutionIf a problem is not mentioned in Correcting problems on Specifications SpecificationApproval Life-Support Policy Declaration of Conformity APC Worldwide Customer Support