Coda Cold-Mount Laminator operation manual Congratulations you have successfully mounted a print

Page 12

Congratulations you have successfully mounted a print!

All boards with the same thickness can now be mounted one after the other without further adjustment.

If mounting onto a substrate of a different thickness, the gap must be re-adjusted. Be sure to check all adjustments prior to running new jobs.

Figure 19

Coda, Inc. • 30 Industrial Avenue • Mahwah, NJ 07430 Phone: 201-825-7400 Fax: 201-825-8133

Email: sales@codamount.com

www.codamount.com

Cold-Mount ® is a registered trademark of Coda Inc.

Cold-Mount® Laminator Operation Manual

January 2006

Image 12
Contents Coda Cold-Mount Laminator Operation Guide Cold-Mount Laminator Operation Guide Index InstructionsLaminator Set-Up Laminator Set-Up Location and Function of Controls Setting the Spring Pressure Adjusting the Rollers for Even Pressure Roller Alignment Procedure Setting the Roller Gap Basic Cold-MountProcedure Basic Cold-MountProcedure Congratulations you have successfully mounted a print Laminating a Print with a Sheeted Laminate Laminating a Print with a Sheeted Laminate Laminating a Print with a Sheeted Laminate Laminating a Print with a Sheeted Laminate Heavy Duty Roll Feed Optional Heavy Duty Roll FeedHeavy Duty Roll Feed Assembly To attach the Heavy Duty Roll Feed to the LaminatorShows the Heavy Duty Roll Feed assembled to a 26 Laminator Laminating with the Heavy Duty Roll Feed Laminating with the Heavy Duty Roll Feed Coating Boards with the Heavy Duty Roll Feed Coating Boards with the Heavy Duty Roll Feed Coating Boards with the Heavy Duty Roll Feed Coda Cold-Mount System Coda Cold Pressure Sensitive Laminates Coda Mounting Adhesives Coda Pre-Coated Boards Coda Accessories