GBC 930-032 operation manual Jog/Slow Speed w/Guard Open, Emergency stops E-Stop, Safety shields

Page 10

Voyager3

Operations Manual: Safety

Jog/Slow Speed w/Guard Open

1.3 Emergency stops (E-Stop)

The Voyager 3 is equipped with three E-Stops. One is located on the feeder next to the feeder pile table controls, the second is located on the laminator con- trol panel and the third is located on the top of the laminator electrical box.

To engage an E-Stop, press the E-Stop in. When any one of the three E-Stops is engaged, all functions of the machine are stopped and the main pressure roller is lowered.

The Jog and Reset buttons must be held simultane- ously to allow the slow speed jogging with the safe- ty guard open. Speed is monitored by relay for safe- ty purposes.

1.4 Safety shields

The two safety shields, one covering the main roller and the second covering the separator section, per- form the same function as an emergency stop.

Both safety shields have a key switch. Once the key is removed from the switch, all functions of the machine are stopped and the main pressure roller is lowered.

To disengage the main roller safety shield switch, pull up on the safety shield handle located on the operator side of the laminator.

WARNING: Burn hazard, chrome cylinder stays hot.

To continue operation, all E-Stops must be in the up position. To release an E-Stop, pull button out.

To disengage the separator safety shield switch, slide the shield back towards the stacker table and raise.

Page 1-4

2004 General Binding Corporation

Image 10
Contents Voyager Page Voyager General Binding Corporation III General Binding Corporation Safety Explanation of symbolsGeneral rules of safety Following actions can result in machine damage Jog/Slow Speed w/Guard Open Safety shieldsEmergency stops E-Stop Pneumatics HeatSafety labels Voyager Main Power Switch Sharp EdgeGBC Films Group Know your laminator Over view FeederLaminator Separator Voyager Limited 90-Day Warranty Voyager Specifications Feeder Specifications Feeder Air Pump Specifications Power Requirement Power supplied by the laminator HeaterInstallation Pre-installationTo .1.2 connections Water supply drop Installation Receiving the crates Uncrating Laminator Positioning the componentsStacker table Vacuum/ pump ConveyorWater heater/ reservoir tank 1 Component placement Safety Checklist Voyager