The GBC Voyager 3 is shipped in two crates. Both crates should arrive at the same time on your docks.

INFORMATION: ALL SHIPMENTS ARE EX- WORKS. At our dock, title passes to the buyer. Please review your insurance cover- age prior to shipment, as you are responsible for all subsequent freight charges and risks.

INFORMATION: Before signing the BILL OF LADING, you should be sure to inspect the crates and/ or pallets for signs of damage or missing items; if applicable, make note of this on the BILL OF LADING.

WARNING: The GBC Voyager 3 Laminator is a large and heavy piece of equipment. It is necessary to employ LICENSED RIGGERS ONLY to move the laminator components.

CAUTION: The GBC Voyager 3 Laminator is not designed to be tipped up side down or sideways in any way. Such action disturbs the exact alignment of the rolling parts of the machine and may require costly and exten- sive realignment.

CAUTION: Do not attempt to remove the sides of the crate by yourself. You can be seriously injured and/ or cause damage to the laminator components.

Below is an example of a typical crated unit. Your crate may have some minor differences but should uncrate in the same manner.

CAUTION: Do not use a knife or other sharp objects to remove shrink wrap or pre mask- ing from around the laminator. You can cause irreparable damage to the rollers.

2004 General Binding Corporation

Page 4-5

Image 29
Contents Voyager Page Voyager General Binding Corporation III General Binding Corporation Explanation of symbols SafetyGeneral rules of safety Following actions can result in machine damage Emergency stops E-Stop Safety shieldsJog/Slow Speed w/Guard Open Heat PneumaticsSafety labels Voyager Sharp Edge Main Power SwitchGBC Films Group Over view Feeder Know your laminatorLaminator Separator Voyager Limited 90-Day Warranty Voyager Specifications Feeder Specifications Feeder Air Pump Specifications Heater Power Requirement Power supplied by the laminatorPre-installation Installation To .1.2 connections Water supply drop Installation Receiving the crates Uncrating Stacker table Positioning the componentsLaminator Water heater/ reservoir tank ConveyorVacuum/ pump 1 Component placement Safety Checklist Voyager