Voyager3
Operations Manual: Installation
4.4 Positioning the components
All components are positioned by the center line of the laminator. The components should be posi- tioned in the following order; Laminator, stacker table, feeder, conveyor, vacuum/ pump and then the water heater. Refer to Figure 4.4.1 Component Placement.
WARNING: Always consult your licensed riggers before attempting to move the com- ponents. You may be seriously injured and/ or cause damage to the machine.
WARNING: Do not attempt to move the components of the GBC Voyager 3 across anything other than a flat level surface with- out trained and qualified riggers.
It is recommended to move each component in the following manner but you should consult the licensed riggers for alternative methods that best fit your situation and surroundings.
WARNING: To safely move the components, use as many people necessary to assist in keeping the components stable during movement.
CAUTION: Exercise safe lifting practices to avoid serious injury to yourself and the equipment.
Laminator
Once the laminator has been safely removed from the crate, you can move the laminator into position by using a pallet jack or forklift.
To move the laminator, approach the laminator from the front and guide the forks under the laminator where indicated on the laminator.
Fork Lift
Stacker table
The stacker table can be easily carried by two peo- ple and attached to the laminator once the lamina- tor has been set into position.
To attach the stacker table, position the stacker table hooks onto the stacker table support rod locat- ed at the back of the laminator.
Stacker table hook
Stacker table support rod