Testing “Tank 1” in Runtime
Load the project to the panel and test the functions in the "Tank 1" screen.
Note
If the reservoir is filled, the drain valve cannot be opened.
You first have to drain the reservoir using the “MANUAL_DRAIN_RES” (I1.6).
If you set the acquisition cycle of all tags to 100 ms, the actuation of the buttons and the valve function will be updated faster.