Installing the
Protect the equipment
1)Never assume that electrical power is disconnected. Do check it first.
2)Do a previous
3)Always disconnect AC power cable during the installation when moving the equipment.
3. Site requirements
To assure normal operation and avoid unnecessary maintenance, it is recommended to prepare your site before installation.
Planning a proper location for the IPR-S1000
1)Place the
2)Keep the product safe from heat, dust and moisture.
3)Make sure the site maintains an ambient temperature of 5° to 45°C.
4. Installation checklist
To assist you with your installation and to provide a historical record of what was done and by whom, fill in the following
Installation Checklist
Task | Verified | |
by | ||
|
Date the
The
Types and numbers of interfaces verified
Safety recommendations and guidelines reviewed
Site requirements verified
Date
4