ADTRAN T1-FT1 user manual Power UP Testing and Initialization, Self Test

Page 36

Chapter 2. Installation

POWER UP TESTING AND INITIALIZATION

When shipped from the factory, the TSU is uninitialized and set to factory default conditions. At the first application of power, the unit will automatically execute self tests followed by an initialization sequence which sets up the unit.

Self Test

Upon a power-up or commanded self tests the LCD displays ADTRAN TSU INITIALIZING and the LEDs illuminate sequentially. When the self test is completed with no failures detected, the LCD will momentarily display ALL TESTS PASSED. If a failure is detected it is displayed in the LCD window. The automatic self test procedure consists of the following tests.

1.Board level tests.

RAM tests; EPROM checksum

On board data path. Sending a known test pattern through an on board loop.

2.Unit level tests.

Front Panel LED verification

Phase Lock Loop verify

2-6

TSU User Manual

61200060L1-1

Image 36
Contents T1-FT1 Data/Channel Service Unit Part Number 1200060L1Page Iii Service REN/SOC FIC UsocPage Important Safety Instructions Warranty and Customer Service Viii Table of Contents Operation Index Index-1 Table of Contents Xii Figure A-1 TSU Complete Menu Diagram List of FiguresList of Figures List of Tables List of Tables T1 Service Offerings IntroductionT1/FT1 Overview Fractional T1 TSU Overview Functional DescriptionFunction Test JacksControl Features InterfacesNetwork Interface Nx56/64 Serial InterfaceControl Port Input Chain Por t OutputThree Methods of Control Front PanelAdtran PC Program SnmpTSU Clock Sources Network TimedDTE Timed DTE Clock SourceInternal Timing Internal Clock SourceTSU Testing Self TestsLoopback Tests Network Loopbacks TSUDTE Interface Loopbacks All OnesApplication 511Installation UNPACK, INSPECT, Power ConnectionPower Connection Adtran Shipments IncludeWiring NetworkNetwork Pin Connection PIN Name Description Control In/Chain Control In/Chain In Pin Connection Control PIN Connection Name Description Chain Out Chain Out Pin ConnectionChain OUT PIN Connection Nx56k/64k DTE Primary V.35 Pin ConnectionNx 56k/64/ DTE PIN Connection PIN Ccitt DescriptionPower UP Testing and Initialization Self TestOperation Methods of OperationCancel Front Panel OperationALM LCD WindowGeneral Menu Operation T a T U SO N F I G Setting the Data Field E T W O R K N N I TCode Z S Viewing Display Only Data Fields To Exit Any Menu Field Operation or DisplayMenu Structure Four Opening MenusFour Opening Menu Functions Fact Restore UtilTIME/DATE Software VersionMenu Operation Status Menu1RESET Perf Cntrs NI Perf RPTS, Submenu of 1StatusMinutes Hours 15MIN / 24HRData Values Alarm Investigated State Active/InactiveCurr ERR/ALM Submenu of 1Status Clear History ERR/ALM Hist Submenu of 1StatusConfiguration Complete Configuration MenuNetwork NI Submenu of 2 Config O R M a T Code Z SXmit PRM O N T R O L P O R T Alarm S UNIT, Submenu of 2 ConfigCntrl Port Alarms Data RatePORT, Submenu of Config Rate 56/64Normal Mode of Operation # of ChanUtil 1Time/Date, Submenu of 3UtilM E 0 5 0 7 0 T E 0 8 / 0 5 / 9 Keystroke Summary for Editing Time/Date2Software Rev, Submenu of 3Util 3Reinit Unit, Submenu of 3Util5Fact Restore, Submenu of 3Util E I N I T D D R E S S 0 04Address,Submenu of 3Util Test Complete Test Menu1Network Tests, Submenu of 4Test Loopback or 3PATTERN R 5 1 1 Error S 5 1 1 Error S = 5 2Run Selftest, Submenu of 4TestS T E M S E L F T E S T T E L O O P B C K O F F3Port Tests submenu of 4Test Operation Testing Example Far End Looped Back TestN I T O R 3 U T I L Network Interface TestE T W O R K T E S T S U N S E L F T E S T Press Enter to activate a Remote Payload Loopback Testing Example Figure A-1. TSU Complete Menu Diagram Appendix a TSU Complete MenuAppendix A. TSU Complete Menu Appendix B DTE Data Rate Chart DTE Data Rate vs DS0s N # of DS0s NDTE Rate = 56K Appendix B. DTE Data Rate Chart Index NumericsIndex Presales Inquiries and Applications Support Post-Sale SupportRepair and Return