LG Electronics PCM-MS2 installation manual Checking the thread depth on your flat panel

Page 8

Checking the thread depth on your flat panel

1.Insert the thread depth indicator (supplied) through the thread inserts found on the back of the flat panel to make sure the inserts measure the same full depth and mark it. (see figure 1)

2.Locate the correct diameter screw for the thread insert. Compare your marking to the screws (supplied). If your selected screw is longer than the marking on the thread depth indicator DO NOT USE this screw.

The screw length must not bypass the marking. Select another screw size

(see figure 2 and 3). Until you find one that comes closest to your mark without going past.

Figure 2

Figure 3

Figure 1

Inverted flat panel

display

Marking the depth

Thread insert

Thread depth

indicator

Screw

Marking

Thread depth indicator

Screw

Marking

- 8 -

Thread depth indicator

 

Image 8
Contents Universal flat-panel mount Contents Assembly drawing DescriptionFlat panel list Electrograph IkegamiRCA Parts list Parts list con’t Checking the thread depth on your flat panel Parts list con’t Finding center of the flat panel display Positioning the mounting brackets Align Mounting brackets Securing the mounting brackets Mounting slot positions Look at the assembly drawing on Finding the wood studs behind the wall structureMarking the bottom plate mounting points Securing the bottom wall plate Securing the top plate Drill four 4 ¼ pilot holes to the marked wall. See figureTightness and Security Securing the flat panel to the wall mount BottomLateral shift Lateral shift adjustment North America