Troubleshooting
General
Ensure that the SFP+ or XFP module is inserted correctly into the transceiver port.
Ensure that the copper cabling
No connectivity
If unable to get full connectivity with all DIP switches in the UP position, these procedures can be used for troubleshooting.
Built In Link Test
The Built In Link Test requires two 10GBaseT modules/converters.
Choose one side of the link to generate the test data (master side) and one side to receive and analyse the test data (slave side).
1.Set Switch 1 down and Switch 2 to the Up position (Built In Link Test) on the master side.
2.The master side automatically sends test data to the slave side.
3.The slave side analyses the received test data and sends its own test data plus a diagnostic code back to the master side.
4.If the PWR LED on the master side blinks red then this connection may require further testing.
5.If the PWR LED on the master side blinks green after several seconds of testing, then the SPF+/XFP link is passing the Built In Link Test.
6.The Built in Link Test continues to run until Switch 1 on the master side is set back to Data mode.
Perle | 13 |