Pelco Dx8000 manual C1609M 6/04

Page 34

f.Wait while the DX8000 prepares the newly installed drives for video storage. You will see the following progress bar while the formatting is underway.

Figure 31. PDB Database Creation Progress Bar

4.After the storage allocation procedure is complete, the DX8000 will reboot automatically and the unit will be ready to resume service.

32

C1609M (6/04)

Image 34
Contents DX8000 Page Introduction Parts ListTools Needed Removing Power Cord from Wall Getting ReadyRemoving Power Cord from Unit ESD Protection Prepare Unit for Drive Installation Open the Unit ChassisRemoving Chassis Cover Component Layout DX8000 InteriorMove the Front and Rear Cross-Braces Removing Front and Rear Cross-BracesPlacing Front and Rear Cross-Braces Out of the Way Disconnect the Data and Power Cables Removing IDE Data CablesRemoving Hard Drive Power Connections Remove the Drive Mount Baskets Removing Hard Drive BasketInstall Additional Drives Prepare the DrivesMount the Additional Drives Inserting Drives into BasketReplacing Drive Baskets SET the Master / Slave Jumpers Setting Drive Jumpers Install the DX8000-EXD IDE Extender Card Location of PCI SlotPCI Slot 6 Slot Cover Inserting the DX8000-EXD IDE Extender Card Securing the DX8000-EXD IDE Extender Card Reconnect Data and Power Cables Installing the CD-RW Data Cable to the Extender Card Installing Hard Drive Data Cables Installing Hard Drive Power Connectors Reassemble the Unit Replacing Front Cross-BraceReplacing Chassis Cover Restarting Unit Initialize the New Drives to Store Data Opening List of DrivesSelecting Allocation Option for Each Drive Format Warning Dialog Box C1609M 6/04 Product Warranty and Return Information ISO9001
Related manuals
Manual 32 pages 20.54 Kb Manual 10 pages 26.21 Kb Manual 40 pages 3.7 Kb Manual 1 pages 21.57 Kb