Cosco SLD, SLR, SLC manual Slr Slc Sld

Page 1

SLR • SLC • SLD

INSTALLATION GUIDE

®

OPERATOR SPECIALTY COMPANY, INC.

CASNOVIA, MI 49318 • U.S.A.

UL325 COMPLIANCE REQUIRES THE USE OF CONTACT EDGES

OR PHOTOELECTRIC CONTROLS ON ALL AUTOMATIC OR

REMOTELY-CONTROLLED GATE OPERATORS.

Oct. 2005, Rev. 9

Image 1
Contents SLR SLC SLD Table of Contents SLR SLC SLD Operator Installation GuidePRE-INSTALLATION Information Safety InformationGate Operator Classifications Wiring Specifications USE Copper Wire onlyPAD Mounting Instructions for Models SLR, SLC & SLDGate Bracket and Chain Assembly Instructions Optional Torque Limiter Adjustments Vent Plug InstallationTo adjust the torque limiter in models SLR, SLC and SLD Models SLR, SLC and SLD OptionalLimit NUT Adjustments Electrical Connection and AdjustmentsDip Switches Control Board AdjustmentsBoard Control With Motor Close Terminal Connection DescriptionsClose Direction Current Sense Adjustment Current Sensing AdjustmentsOpen Direction Current Sense Adjustment Multi-turn PotentiometerOnboard L.E.D. Indicator Descriptions Surge Protector Instructions Important Notes for Installation MASTER/SLAVE ApplicationsCharger Board Sleep Mode Control and Accessory Connection Illustrations SLR SLC SLD Operator Installation Guide SLR SLC SLD Operator Installation Guide AC Models only Loop Layout Illustration Edge Layout Illustration #1 Edge Layout Illustration #2 Photo EYE Illustration Picket Gate Illustration Track Gate Illustration Operator fails to start TroubleshootingModel SLR Mechanical Parts Exploded View Description Model SLR Mechanical Parts ListModel SLC Mechanical Parts Exploded View Description Model SLC Mechanical Parts ListModels SLR SLC Control BOX Parts List Model SLD Mechanical Parts Exploded View Model SLD Mechanical Parts List Model SLD Control BOX Parts List Brush Replacement Battery MaintenanceMaterial Safety Data Sheet Mobil SHC Imperial Oil SLR SLC SLD Operator Installation Guide General Preventative MaintenanceThis page intentionally left blank Gate Operator Installation Checklist