SLR • SLC • SLD OPERATOR INSTALLATION GUIDE
ELECTRICAL CONNECTION AND ADJUSTMENTS
Power supply must be of correct voltage and phase.
Always disconnect power from operator before servicing.
Keep clear of gate during operation.
All OSCO gate operators are supplied with a power disconnect switch to turn on and off the power supply available to the operator. Incoming power should be brought into the operator and connected to the labeled pigtails in the disconnect box following wiring specifications on page 4. A wiring connections print can be found on the inside cover of the operator.
Proper thermal protection is supplied with the operator. The motor contains a thermal overload protector to protect from overheat- ing the motor due to overload or
LIMIT NUT ADJUSTMENTS
The limit nuts are not preset at the factory and must be adjusted for the length of the gate the operator is installed on. The limit switches are activated by two threaded nylon rotary limit nuts which are attached to a threaded shaft and driven by chain and sprockets from the main drive shaft. Remove the cardboard filler before attempting to adjust the limit nuts.
With the gate connected to the gate operator in a
Once the gate is in this position, adjust the open limit nut until it activates the limit switch for open,
Once the open limit nut is set, repeat the above process for the close direction nut and the
After finishing the initial limit nut adjustments, reposition the gate to approximately its center of travel.
POWER DISCONNECT BOX | LIMIT BOX |
(115VAC VERSION SHOWN) |
|
- 8 - |