Cosco SLD, SLR, SLC manual Battery Maintenance, Brush Replacement

Page 34

SLR • SLC • SLD OPERATOR INSTALLATION GUIDE

BATTERY MAINTENANCE

The gel-cell batteries in this operator require no routine maintenance. For assured continued performance, they should be replaced every year.

If power is to be removed for one week or more, disconnect the negative wire from the batteries as this will prevent deep discharging.

Fully charge before use after storage or upon initial installation.

BRUSH REPLACEMENT

Brushes should be inspected every 100,000 cycles, (200,000 for BGU-D) or yearly, whichever comes first. The motor has two brushes, one on each side.

Original brushes are approximately 3/4” long and should be replaced when they are 1/4” long, or sooner. If brushes are allowed to wear beyond this point, permanent damage to the motor may result.

To inspect the brushes, remove retaining cap (A), with straight-blade screw- driver, and carefully pull assembly straight out. Measure remaining brush ma- terial (B).

To reinstall, place brush in hold, aligning rounded indentation (C), correctly with motor shaft. Gently push in spring and align contact with oval carrier, push in with retaining cap (D). Hold in place and thread cap into brush carrier. Do not overtighten or cap will crack! Repeat for other brush.

If brushes require replacement, order kit #2510-243.

B

A

D

C

- 34 -

Image 34
Contents SLR SLC SLD SLR SLC SLD Operator Installation Guide Table of ContentsPRE-INSTALLATION Information Safety InformationGate Operator Classifications USE Copper Wire only Wiring SpecificationsSLR, SLC & SLD PAD Mounting Instructions for ModelsGate Bracket and Chain Assembly Instructions To adjust the torque limiter in models SLR, SLC and SLD Vent Plug InstallationOptional Torque Limiter Adjustments Models SLR, SLC and SLD OptionalElectrical Connection and Adjustments Limit NUT AdjustmentsDip Switches Control Board AdjustmentsBoard Control With Motor Terminal Connection Descriptions CloseOpen Direction Current Sense Adjustment Current Sensing AdjustmentsClose Direction Current Sense Adjustment Multi-turn PotentiometerOnboard L.E.D. Indicator Descriptions Important Notes for Installation MASTER/SLAVE Applications Surge Protector InstructionsCharger Board Sleep Mode Control and Accessory Connection Illustrations SLR SLC SLD Operator Installation Guide SLR SLC SLD Operator Installation Guide AC Models only Loop Layout Illustration Edge Layout Illustration #1 Edge Layout Illustration #2 Photo EYE Illustration Picket Gate Illustration Track Gate Illustration Troubleshooting Operator fails to startModel SLR Mechanical Parts Exploded View Model SLR Mechanical Parts List DescriptionModel SLC Mechanical Parts Exploded View Model SLC Mechanical Parts List DescriptionModels SLR SLC Control BOX Parts List Model SLD Mechanical Parts Exploded View Model SLD Mechanical Parts List Model SLD Control BOX Parts List Battery Maintenance Brush ReplacementMaterial Safety Data Sheet Mobil SHC Imperial Oil SLR SLC SLD Operator Installation Guide Preventative Maintenance GeneralThis page intentionally left blank Gate Operator Installation Checklist