Cosco SLC, SLR, SLD manual Picket Gate Illustration

Page 23

SLR • SLC • SLD OPERATOR INSTALLATION GUIDE

PICKET GATE ILLUSTRATION

Refer to Connection Descriptions on page 10 and Accessory Connections on pages 15-18 for additional details.

- 23 -

Image 23
Contents SLR SLC SLD Table of Contents SLR SLC SLD Operator Installation GuideGate Operator Classifications Safety InformationPRE-INSTALLATION Information Wiring Specifications USE Copper Wire onlyPAD Mounting Instructions for Models SLR, SLC & SLDGate Bracket and Chain Assembly Instructions Models SLR, SLC and SLD Optional Vent Plug InstallationOptional Torque Limiter Adjustments To adjust the torque limiter in models SLR, SLC and SLDLimit NUT Adjustments Electrical Connection and AdjustmentsBoard Control With Motor Control Board AdjustmentsDip Switches Close Terminal Connection DescriptionsMulti-turn Potentiometer Current Sensing AdjustmentsClose Direction Current Sense Adjustment Open Direction Current Sense AdjustmentOnboard L.E.D. Indicator Descriptions Surge Protector Instructions Important Notes for Installation MASTER/SLAVE ApplicationsCharger Board Sleep Mode Control and Accessory Connection Illustrations SLR SLC SLD Operator Installation Guide SLR SLC SLD Operator Installation Guide AC Models only Loop Layout Illustration Edge Layout Illustration #1 Edge Layout Illustration #2 Photo EYE Illustration Picket Gate Illustration Track Gate Illustration Operator fails to start TroubleshootingModel SLR Mechanical Parts Exploded View Description Model SLR Mechanical Parts ListModel SLC Mechanical Parts Exploded View Description Model SLC Mechanical Parts ListModels SLR SLC Control BOX Parts List Model SLD Mechanical Parts Exploded View Model SLD Mechanical Parts List Model SLD Control BOX Parts List Brush Replacement Battery MaintenanceMaterial Safety Data Sheet Mobil SHC Imperial Oil SLR SLC SLD Operator Installation Guide General Preventative MaintenanceThis page intentionally left blank Gate Operator Installation Checklist