Cosco SLC, SLR, SLD manual Slr, Slc & Sld, PAD Mounting Instructions for Models

Page 5

SLR • SLC • SLD OPERATOR INSTALLATION GUIDE

PAD MOUNTING INSTRUCTIONS FOR MODELS

SLR, SLC & SLD

Before installing, make sure the gate rolls or slides freely, and that all exposed rollers are properly covered. The gate must be covered with fabric with openings no larger than 2 1/4” in size, to a minimum height of 48 inches above ground level. On picket-style gates, if pickets are spaced less than 2 1/4” apart, mesh is optional.

To assemble the drive chain and gate brackets, refer to Page 6. Make sure that the chain sag does not exceed recommended sizes and that the chain does not come into contact with the moving parts of the gate or ground.

A SEPARATE PEDESTRIAN GATE IS REQUIRED

FOR ALL PEDESTRIAN TRAFFIC.

THIS GATE MUST BE A MINIMUM DISTANCE

OF SEVEN (7) FEET FROM THE

VEHICULAR GATE AND GATE OPERATOR.

- 5 -

8-04-5

Image 5
Contents SLR SLC SLD Table of Contents SLR SLC SLD Operator Installation GuideGate Operator Classifications Safety InformationPRE-INSTALLATION Information Wiring Specifications USE Copper Wire onlyPAD Mounting Instructions for Models SLR, SLC & SLDGate Bracket and Chain Assembly Instructions Optional Torque Limiter Adjustments Vent Plug InstallationTo adjust the torque limiter in models SLR, SLC and SLD Models SLR, SLC and SLD OptionalLimit NUT Adjustments Electrical Connection and AdjustmentsBoard Control With Motor Control Board AdjustmentsDip Switches Close Terminal Connection DescriptionsClose Direction Current Sense Adjustment Current Sensing AdjustmentsOpen Direction Current Sense Adjustment Multi-turn PotentiometerOnboard L.E.D. Indicator Descriptions Surge Protector Instructions Important Notes for Installation MASTER/SLAVE ApplicationsCharger Board Sleep Mode Control and Accessory Connection Illustrations SLR SLC SLD Operator Installation Guide SLR SLC SLD Operator Installation Guide AC Models only Loop Layout Illustration Edge Layout Illustration #1 Edge Layout Illustration #2 Photo EYE Illustration Picket Gate Illustration Track Gate Illustration Operator fails to start TroubleshootingModel SLR Mechanical Parts Exploded View Description Model SLR Mechanical Parts ListModel SLC Mechanical Parts Exploded View Description Model SLC Mechanical Parts ListModels SLR SLC Control BOX Parts List Model SLD Mechanical Parts Exploded View Model SLD Mechanical Parts List Model SLD Control BOX Parts List Brush Replacement Battery MaintenanceMaterial Safety Data Sheet Mobil SHC Imperial Oil SLR SLC SLD Operator Installation Guide General Preventative MaintenanceThis page intentionally left blank Gate Operator Installation Checklist