Allstar Products Group HDSWG 1000 owner manual PRE POWER-ON Checklist, Running the Hdswg

Page 21

Triac Light stays ON. Lock light is ON.

6.Terminal #6, Stop,: Both Open and Close Triac lights are momentarily ON, then both Open and Close Triac lights go OUT. The Lock light goes OUT. The stop light is ON as long as the wire is held on the terminal and the stop light goes OUT when the wire is removed.

7.Terminal #7, Close.: Observe that the Close Triac Light comes ON, the Lock light is ON and the Close light is ON. Remove the wire from terminal #7 and observe that the Close light goes OUT the Triac and Lock lights stay ON.

8.Terminal #9, Reversing Loop,: Observe that both Triac lights are ON momentarily and then the Close Triac light goes OUT and the Open Triac light stays ON. The lock light is ON.

9.Terminal #6, Stop,: Same as before above, Sequence 6.

10.Terminal #12, Alternate: Alternate light is ON, Close Triac light is ON and Lock light is ON. Remove wire and note that the Alternate light goes OUT but the Close and Lock lights stay ON.

11.Hit Terminal #12, Alternate again: Note that the Alternate light comes ON, that the Close Triac light goes OUT and that the Open Triac light comes ON and that the Lock light stays ON.

12.With the multimeter set to measure DC voltage on the 50 Volt scale or more, measure approximately 28 Volts DC at Terminal #1, LOCK.

CHECK OF THE INDICATOR LAMPS HAS BEEN COMPLETED.

I F T H E I N D I C A T O R T E S T P E R F O R M E D SATISFACTORILY, TURN OFF THE AC POWER SWITCH AT THE HDSWG 1000 CONTROL BOX AND REPLACE THE 15 AMP FUSE.

PRE POWER-ON CHECKLIST

Before running the HDSWG 1000, make sure

1.The proper Left-or Right-hand or Bi-Parting wiring has been completed.

2.The Limit Switch Cams have been preliminarily set.

3.The Motor Overload Sensitivity has been preset.

4.The Switch Selectable Options have been set.

5.The Gate has been positioned in the center of it's travel.

6.The Torque Limiter is properly adjusted.

7.No other devices should be connected to the terminal strip until the powering-up procedures are completed.

D:STARTING THE OPERATOR

RUNNING THE HDSWG 1000

Turn ON the main power switch. The stop cycle "thump" should be heard and both the OPEN and CLOSE Triac Lamps should come on for approximately 1/2 second and then go out. The gate should not move. If the gate moves in either direction more than a few inches or continues to run, turn off the power and call Factory Service for assistance.

WARNING!

RISK OF ENTRAPMENT

OVERLOAD SENSITIVITY HAS NOT BEEN SET. DO NOT ALLOW ANYONE NEAR THE GATE AND DO NOT LEAVE GATE AND HDSWG 1000 UNATTENDED UNTIL FOLLOWING PROCEDURES HAVE BEEN COMPLETED.

USE CAUTION DURING THIS FINAL

ADJUSTMENT PERIOD.

1.Give the HDSWG 1000 a command to open by touching the jumper wire connected to Terminal #13 (COMMON) to Terminal #8 (RADIO OPEN). The gate should move to the fully open position.

2.If the TIMER TO CLOSE option has been selected, the timer will activate the gate to close within approximately 45 seconds.

3.Allow the gate to close and note the position of the gate.

IF THE GATE HITS THE OPEN OR CLOSE STOPS OR EITHER THE OPEN OR CLOSE TRIAC LIGHT REMAINS ON AFTER REACHING THE MECHANICAL STOPS AND THE LIMIT SWITCH LIGHT IS "ON", TURN OFF THE MAIN POWER SWITCH. IF THE GATE HITS THE MECHANCAL LIMIT AND THE LIMIT SWITCH LIGHT DOES NOT COME ON, THE LIMIT CAM OR THE STOP WILL NEED TO BE READJUSTED

If the gate stops short of the desired fully open or closed position or if it bangs against the end stops, TURN OFF THE MAIN POWER and reset the appropriate Limit Switch Cam. After you have attained the final adjustment, run the HDSWG 1000 open and closed several times to ensure that the positions set will be retained.

21

Image 21
Contents Hdswg Pre-Setting the Motor Overload Sensitivity LOG Date Overload Test Date Tested Dates Operator Serviced PRE-INSTALLATIONGate System Design and Installation Safety Check List AS the Installer YOU are Responsible for Important Installation NotesSwing Gate Entrapment Protection Concrete PADPlacing the Vehicle Detector Loops Preparing the SiteVehicle Detector Loop Blanking for Swing Gates Electrical Power RequirementsService Conduit Other Voltages and Three Phase SystemsTools Required InstallingPlacing the Hdswg 1000 Mechanical Unit Installing the Hdswg 1000 ARMInstalling the Operator Installing the Hdswg 1000 Control BOXElectrical Hook UP Connecting the Mechanical Unit to the Control BOX Connecting the AC WiringBI-PARTING Wiring Volt InstallationsLeft/Right Hand Installation Limit & Motor Wiring Diagram Bi-Parting Installation Limit & Motor Wiring Diagram Wiring Radio Receivers to the Terminal Strip Accessory Equipment HOOK-UPFour Wire Receivers Wiring a 3-BUTTON StationThree Terminal Receivers Vehicle Detector Power Wiring a KEYPAD, Card Reader or Telephone Entry SystemWiring Vehicle Detectors Connecting the Vehicle Detector to the HdswgDescription # NameSetting the Limit Switches LEFT-HANDED Operation Setting the Limit Switches RIGHT-HANDED OperationPresetting the Motor Overload Sensitivity Setting the Switch Selectable OptionsTimer to Close Setting Applying Power to the HdswgPRE-POWER Check List Checking the Indicator LightsRunning the Hdswg PRE POWER-ON ChecklistMaximum RUN Timer Final Setting of the Close TimerFinal Setting of the Motor Overload Sensitivity Vehicle Detectors Installation Notes for Auxiliary EquipmentPrecautions for Pedestrian Traffic or Residential Areas Gate Opener System Operation & Safety GuideGate Opener System Operation & Safety Maintain the Gate and Gate Hardware aMaintain ALL Components of Gate System Hdswg 1000 Mechanical Unit Exploded View Mechanical Unit Exploded ViewARM KIT & Control BOX Exploded View & Parts Mechanical Unit Parts ListPhysical Drive Technical SpecificationsElectrical Capacities