C: INSTALLING THE
TOOLS REQUIRED
The following tools and materials are required for a proper installation of the HDSWG 1000.
1.Wire cutter, stripper and crimping tools. (For attaching accessory equipment to the control box barrier strip.)
2.A #2 Phillips Head screw driver for removing the screws to the High Voltage cover.
3.Medium standard straight blade screw driver for the terminal strip screws.
4.Very small blade screwdriver. (For adjusting the potentiometer on the Logic and Power board.)
5.Electric arc welder or an electric drill with a 3/8" bit. (For attaching Arm Bracket to the Gate.)
6.Several feet of #18 or #22 gauge insulated multistrand wire. (For connecting accessory equipment to the control box terminal strip, and for limit switch control wires.)
7.Four 1/2" diameter concrete "redhead" bolts with hex nuts, flat washers and lock washers. (For attaching the HDSWG 1000 to the concrete pad.) (Not Included)
8.Concrete drill and bit. (To drill mounting holes for concrete bolts.)
9.Multimeter. (To test line voltage and other measurements as necessary.)
10.Small level. (To level HDSWG 1000 at installation.)
11.Torque Wrench and
UNPACKING
CHECKLIST
The HDSWG 1000 as shipped consists of the components listed below.
Mechanical Unit | Swing Arm |
| Crank Arm |
Electrical Unit | Crank Arm Extension |
| Swing Gate Fittings |
Wood Pallet with 4 lag bolts | Swing Arm Bracket |
| Swing Arm Padlock with keys |
Instruction Kit | Hardware Package |
Instruction Manual |
|
Warning signs |
|
Swing Arm Kit |
|
9