Allstar Products Group HDSWG 1000 owner manual Installing, Tools Required

Page 9

C: INSTALLING THE

TOOLS REQUIRED

The following tools and materials are required for a proper installation of the HDSWG 1000.

1.Wire cutter, stripper and crimping tools. (For attaching accessory equipment to the control box barrier strip.)

2.A #2 Phillips Head screw driver for removing the screws to the High Voltage cover.

3.Medium standard straight blade screw driver for the terminal strip screws.

4.Very small blade screwdriver. (For adjusting the potentiometer on the Logic and Power board.)

5.Electric arc welder or an electric drill with a 3/8" bit. (For attaching Arm Bracket to the Gate.)

6.Several feet of #18 or #22 gauge insulated multistrand wire. (For connecting accessory equipment to the control box terminal strip, and for limit switch control wires.)

7.Four 1/2" diameter concrete "redhead" bolts with hex nuts, flat washers and lock washers. (For attaching the HDSWG 1000 to the concrete pad.) (Not Included)

8.Concrete drill and bit. (To drill mounting holes for concrete bolts.)

9.Multimeter. (To test line voltage and other measurements as necessary.)

10.Small level. (To level HDSWG 1000 at installation.)

11.Torque Wrench and 1-5/8” Socket

UNPACKING

CHECKLIST

The HDSWG 1000 as shipped consists of the components listed below.

Mechanical Unit

Swing Arm

 

Crank Arm

Electrical Unit

Crank Arm Extension

 

Swing Gate Fittings

Wood Pallet with 4 lag bolts

Swing Arm Bracket

 

Swing Arm Padlock with keys

Instruction Kit

Hardware Package

Instruction Manual

 

Warning signs

 

Swing Arm Kit

 

9

Image 9
Contents Hdswg Pre-Setting the Motor Overload Sensitivity LOG Date Overload Test Date Tested Dates Operator Serviced PRE-INSTALLATIONGate System Design and Installation Safety Check List AS the Installer YOU are Responsible for Important Installation NotesSwing Gate Entrapment Protection Concrete PADPlacing the Vehicle Detector Loops Preparing the SiteVehicle Detector Loop Blanking for Swing Gates Electrical Power RequirementsService Conduit Other Voltages and Three Phase SystemsTools Required InstallingPlacing the Hdswg 1000 Mechanical Unit Installing the Hdswg 1000 ARMInstalling the Operator Installing the Hdswg 1000 Control BOXElectrical Hook UP Connecting the Mechanical Unit to the Control BOX Connecting the AC WiringBI-PARTING Wiring Volt InstallationsLeft/Right Hand Installation Limit & Motor Wiring Diagram Bi-Parting Installation Limit & Motor Wiring Diagram Wiring Radio Receivers to the Terminal Strip Accessory Equipment HOOK-UPFour Wire Receivers Wiring a 3-BUTTON StationThree Terminal Receivers Vehicle Detector Power Wiring a KEYPAD, Card Reader or Telephone Entry SystemWiring Vehicle Detectors Connecting the Vehicle Detector to the HdswgDescription # NameSetting the Limit Switches LEFT-HANDED Operation Setting the Limit Switches RIGHT-HANDED OperationPresetting the Motor Overload Sensitivity Setting the Switch Selectable OptionsTimer to Close Setting Applying Power to the HdswgPRE-POWER Check List Checking the Indicator LightsRunning the Hdswg PRE POWER-ON ChecklistMaximum RUN Timer Final Setting of the Close TimerFinal Setting of the Motor Overload Sensitivity Vehicle Detectors Installation Notes for Auxiliary EquipmentPrecautions for Pedestrian Traffic or Residential Areas Gate Opener System Operation & Safety GuideGate Opener System Operation & Safety Maintain the Gate and Gate Hardware aMaintain ALL Components of Gate System Hdswg 1000 Mechanical Unit Exploded View Mechanical Unit Exploded ViewARM KIT & Control BOX Exploded View & Parts Mechanical Unit Parts ListPhysical Drive Technical SpecificationsElectrical Capacities