WARNING!
RISK OF ENTRAPMENT.
TO MINIMIZE POTENTIAL FOR GATE CONTROLS TO BE ACTIVATED WHILE ALREADY IN USE, LOCATE THE HDSWG 1000 CONTROL BOX IN FULL VIEW OF THE GATE.
C:INSTALLING THE OPERATOR
ELECTRICAL HOOK UP
The HDSWG 1000 electrical connection is made at the electrical junction box provided in the HDSWG 1000 CONTROL BOX, see Figure 11. There are three cutouts on the bottom of the CONTROL BOX to permit conduit entry. Run a flexible water tight conduit from the service junction box to the access hole that is just under the junction box containing the main power switch of the HDSWG 1000. Pull three #14 wires from the service junction box to the junction box inside the HDSWG 1000 Control Box. If the HDSWG 1000 is wired for 115 Volts, pull a black, white and green wire. If the HDSWG 1000 is wired for 230 Volts, pull a black, red and green wire.
INSTALLING THE HDSWG 1000 CONTROL BOX
The HDSWG 1000 CONTROL BOX may be mounted remotely from the MECHANICAL UNIT. Four mounting holes are provided at the back of the CONTROL BOX. These should be used to mount the CONTROL BOX to a solid, flat surface. Use a caulking material around the holes to ensure a water tight seal. The CONTROL BOX should be located so that the Gate and the
MECHANICAL UNIT/UNITS ARE IN FULL VIEW FROM
THE CONTROL BOX.
105100
WARNING! |
TO AVOID ELECTRICAL DAMAGE TO OPERATOR DO NOT ALLOW TOTAL WIRE LENGTH FROM THE CONTROL BOX TO AC POWER SERVICE PANEL PLUS THE DISTANCE FROM THE CONTROL BOX TO THE MECHANICAL UNIT TO EXCEED WIRE LENGTH GIVEN IN TABLE 1 FOR AC SERVICE.
Figure 11: Schematic & Wiring Diagram
11