5.5.1TIU20X Configuration of the RS-485 Port

The configuration bank (shown in Figure 2.23) sets the parameters of the RS-485 port as described in Table 5.1.

 

Table 5.1 – Configuration Bank

Switch 1

ON: Pull-up (must be used together with switch 3)

 

OFF: no Pull-up

Switch 2

ON: 120termination

 

OFF: no termination

Switch 3

ON: Pull-down (must be used together with switch 1)

 

OFF: no Pull-down

Switch 4

Reserved for future use

NOTE: Switch 1 and 3 must be used together. Either both pull-up and pull-down are used or neither is used.

Pull-upand Pull-downswitches are used to increase the signal level on the RS-485 bus. This is useful if there is a long bus and a significant amount of attenuation is anticipated.

Termination resistance of 120must be placed across each end of the RS-485 bus. With switch 2 ON, a 120resistance is placed across the bus. This should only be used if the TIU050/10X/11X/20X is the last device at either end of the bus.

5.6TIU20X Dimensions

￿￿￿￿￿+0.02µ>￿￿￿PP@

-0.00

￿￿￿￿µ+0.02

>￿￿￿+0.5

 

 

 

72/(57,8$￿￿1&(6;$5(&87287￿￿￿￿￿￿￿µ>￿￿￿'(7PP@81/(66$,/667$7('27+(5:,6(

-0.00

-0.0

 

83￿￿￿￿µ&RUQHU>5$',86,6$&&(37$%/(￿PP@

 

 

 

 

 

 

 

 

Figure 5.8 – TIU20X Cutout

Image 29
Contents Operator Station Hardware Manual Preface 06 Apr About Programming ExamplesDeclaration of EMC Conformity Table of Contents Networks Operator Station OS Product Line Fanuc Channels IntroductionScope CH Introduction Equipment Needed CH Introduction Parameter Conditions Min Typical Max Units 06 Apr GFK-1819 Technical SpecificationsSoftware Upgrade GFK-1819 Upgrade Revision Software & FirmwareFirmware Upgrade Scope06 Apr GFK-1819 CH Introduction CH.2 TIU050 06 Apr GFK-1819 TIU050 Contrast AdjustmentTIU050 06 Apr CH TIU050 GFK-1819 TIU050 Ports 1 TIU050 Configuration of the RS-485 PortConfiguration Bank TIU050 Cutout TIU050 Dimensions06 Apr CH TIU050 GFK-1819 CH TIU100/101/102/103 06 Apr GFK-1819 TIU10X Contrast AdjustmentRear View of TIU100/101/102 TIU100 Ports 06 Apr CH.3 TIU100/101/102/103 GFK-1819 Tiux Rear ViewAutomation Equipment Port Receive Transmit LEDs 1 TIU10X Configuration of the RS-485 Port06 Apr CH.3 TIU100/101/102/103 GFK-1819 TIU10X DimensionsCH TIU110/111/112/113 06 Apr GFK-1819 TIU11X Contrast AdjustmentRear View of TIU11X TIU110 Ports 06 Apr CH TIU110/111/112/113 GFK-1819 TIU11X Rear ViewSerial P ort 06 Apr CH TIU110/111/112/113 GFK-1819 1 TIU11X Configuration of the RS-485 PortTIU11X Dimensions Front View of TIU20X TIU20X Button Selection Actions CH TIU200/201/202/203 06 Apr GFK-1819Automated Equipment Serial Port Rear View of TIU20X TIU20X PortsLED’s flash when the TIU20X Is communicating with the AE 06 Apr CH TIU200/201/202/203 GFK-1819 1 TIU20X Configuration of the RS-485 PortTIU20X Dimensions PC to Operator Station Communications CommunicationsRecommended Automation Equipment Communication Cables RS-232 ConnectionTIU110/100 GFK-1819 RS-422/485 Four-Wire06 Apr GFK-1819 RS-485 Two-Wire + SR GFK-1819 Current LoopSelf-Test Getting StartedProtocol Name Software Revision Terminal Type Select Update TIU Protocol from the File menuGFK-1819 Updating the Protocol CsCAN Network Overview NetworksScope Controller Area Network can Overview DeviceNet Overview DeviceNet FeaturesDeviceNet Operation DeviceNet ProtocolCan Network Cabling GFK-1819 Can Wiring Rules06 Apr GFK-1819 Profibus Profibus WiringE term in atio n H m Installing SmartStack Modules Installing and Removing a SmartStack ModuleSmartstack  Removing SmartStack ModulesCH Smartstack