A S S E M B LY STEP 2
INTRODUCTION
HARDWARE BAG 2 CONTENTS :
UPQWJFX
"3$8"4)&3 % 2UZ
BOHMFWJFX
A | Open HARDWARE BAG 2. |
B | With running deck in lowered |
| position, place console |
| on upright masts. Slide the |
| brackets that are underneath the |
| console into the top holes of the |
| upright masts. |
C | Place Lock Washer (C) and |
| bolt (B) into flat side of left |
IMPORTANT PRECAUTIONS
|
| |
|
| |
8"4)&3 | $ | "3$8"4)&3 % |
|
| |
|
| |
"3$8"4)&3 % |
| %0/05"55"$) |
|
* Be sure to tighten bolts after all are lined up.
| upright mast and lightly tighten. |
D | Place Arc Washer (D) and bolt |
| (B) into curved side of left |
| upright mast and lightly tighten. |
E | Gently lift right side of the |
| console to connect the console |
| cable. Carefully tuck wires in |
| mast to avoid damage. NOTE: Do |
| not pinch console cable or grip |
| pulse wires. |
F | Repeat steps |
| assemble the right side upright |
| mast and console. |
ASSEMBLY
BEFORE YOU BEGIN
TREADMILL OPERATION
G Tighten all bolts completely.
ASSEMBLED IN STEP
TROUBLESHOOTING CONDITIONING & MAINTENANCE GUIDELINES
8
LIMITED WARRANTY