ParaBody 400101 manual Roller PAD 32 with rubbing alcohol or water. Also

Page 15

 

 

 

 

STEP 20

 

 

 

71

 

 

• Assemble two 3/4” THRUST WASHERS (68) and two PEC

 

 

 

 

 

 

19

 

CAMS (24) to the LEFT (20) & RIGHT (19) PEC ARMS, as

 

 

 

shown on FIGURE 20.

 

 

 

 

 

 

 

 

 

 

• Insert four 3/4” FLANGE BEARINGS (69) into the bushings

 

 

 

 

of the BEARING HOUSING (17).

 

20

 

68

 

 

 

 

 

 

 

 

 

 

 

 

 

 

• Insert the LEFT (20) & RIGHT (19) PEC ARMS through the

 

 

 

 

3/4” FLANGE BEARINGS (69) in the BEARING HOUSING

 

 

 

 

(17) on their respective side as shown, and secure them in place

 

 

 

 

with two 3/4” STARLOCK COLLARS (73).

 

 

 

32

 

 

 

 

 

 

 

• Slide two PEC DEC ROLLER PADS (32) onto the LEFT (20)

 

 

 

 

& RIGHT (19) PEC ARMS until the ROLLER PAD (32) is

 

 

 

 

flush with the bottom of the pec arms.

 

 

69

 

 

 

 

 

 

 

 

(NOTE: If a lubricant is required coat the inside of the

 

24

 

 

ROLLER PAD (32) with rubbing alcohol or water. Also,

 

 

 

 

rotating the pad while pushing up will help ease assembly.)

 

 

 

 

• Securely assemble two 3/8” SPRING PIN ASSEMBLIES (71)

 

 

 

 

to the spring pin barrels of the PEC ARMS (19 & 20).

 

17

 

 

 

 

 

 

69

 

 

 

 

 

 

73

 

 

 

 

 

FIGURE 20

 

 

 

 

 

 

1/2

1/2

1/2

3

1/2

1/2

1/2

0

1

2

4

5

6

 

 

 

15

 

 

 

Image 15
Contents Home GYM Important Notes Parts List Step 50 1/2 LOW Height X 3-3/4 42 1/2 X X 3-3/4 42 1/2 X LOW Height TAB Detail Locknuts 38 3/8 X 2-3/4 Silicon or teflon spray available at most hard Ware stores Tighten 37 3/8 X Roller PAD 32 with rubbing alcohol or water. Also Step 50 1/2 LOW HT X 2-3/4 35 3/8 X Assemble one 3-1/2 Pulley 79 to the Floating Pulley Cable Guide Step Step Step 36 3/8 X 1-3/4 See Detail Cableadjustment Step