ParaBody 400101 manual Cableadjustment

Page 26

93

5

91

92

81

74

57

12

FIGURE 38

26

STEP 38

Screw the threaded end of AB CABLE (91) ap- proximately 3/4” into the end of the PULLEY BRACKET (5) and tighten jam nut securely as shown in FIGURE 38.

IMPORTANT! Make sure the cables are running in the grooves of all pulleys.

CABLEADJUSTMENT

For maximum performance, the HEAD PLATE should should just barely sit on the top WEIGHT PLATE and the UPPER FLOATING PULLEY BRACKET should firmly contact the PLATE on the TOPBOOM, and the LOWER FLOATING PULLEY BRACKET should firmly contact the BASE.

The following adjustments can be made to adjust the cable tension:

If upon completion of assembly, the HEAD PLATE (81) does not sit on top of the first WEIGHT PLATE (74), push the HEAD PLATE

(81) down, insert the WEIGHT STACK PIN (57) and perform several repetitions at the press sta-

tion. This will relax the cable system and prevent the HEAD PLATE (81) from lifting up.

If after completing previous step, the HEAD PLATE (81) still does not sit on top of the first

WEIGHT PLATE (74) or if there is excess slack in the cable system, adjust the threaded end of the LAT CABLE(92) accordingly and retighten the

jam nut.

• If there is excess slack in the LEG CABLE, move

the PULLEY attached to the LEVER STOP (12) down onehole.

If there is excess slack in the AB or PEC DEC cable system, adjust the threaded end of the AB CABLE (91) accordingly and retighten the jam nut.

IMPORTANT! Retighten both jam nuts when adjustment is completed.

Image 26
Contents Home GYM Important Notes Parts List Step 50 1/2 LOW Height X 3-3/4 42 1/2 X X 3-3/4 42 1/2 X LOW Height TAB Detail Locknuts 38 3/8 X 2-3/4 Silicon or teflon spray available at most hard Ware stores Tighten 37 3/8 X Roller PAD 32 with rubbing alcohol or water. Also Step 50 1/2 LOW HT X 2-3/4 35 3/8 X Assemble one 3-1/2 Pulley 79 to the Floating Pulley Cable Guide Step Step Step 36 3/8 X 1-3/4 See Detail Cableadjustment Step