ParaBody 400101 manual 36 3/8 X 1-3/4

Page 24

 

79

 

48

 

93

 

36 3/8 X 1-3/4”

FIGURE 34

5

 

STEP 34

Assemble one 3-1/2” PULLEY (79) around the PEC DEC CABLE (93) and to the PULLEY BRACKET (5) using one 3/8 X 1-3/4” BOLT (36) and one 3/8” LOCKNUT (48) as shown in FIGURE 34.

21

 

93

24

 

FIGURE 35

STEP 35

Slide the ends of the PEC DEC CABLE (93) into the bushings on the PEC CAMS (24) as shown on FIGURE 35.

Lay the PEC DEC CABLE (93) over the pulleys and under the cable retaining clips in the CENTER PULLEY BRACKET (21) as shown in FIGURE 35. (NOTE: The bolt holding pulley and cable retaining clips may need to be loosened to align cable retaining clips with cable.)

24

Image 24
Contents Home GYM Important Notes Parts List Step 50 1/2 LOW Height X 3-3/4 42 1/2 X X 3-3/4 42 1/2 X LOW Height TAB Detail Locknuts 38 3/8 X 2-3/4 Silicon or teflon spray available at most hard Ware stores Tighten 37 3/8 X Roller PAD 32 with rubbing alcohol or water. Also Step 50 1/2 LOW HT X 2-3/4 35 3/8 X Assemble one 3-1/2 Pulley 79 to the Floating Pulley Cable Guide Step Step Step 36 3/8 X 1-3/4 See Detail Cableadjustment Step