2.Orient the Front Stabilizer (15) as shown. While another person lifts the front of the Frame (1), attach the Front Stabilizer to the Frame with two M10 x 112mm Carriage Bolts (76) and two M10 Nylon Locknuts (72).
3.Attach the Frame Rail (52) to the Frame (1) with two M8 x 19mm Button Screws (40) and two M8 Split Washers (55). Be careful to avoid damaging the Side
Shields (26, 27).
4.While another person holds the Upright (2) in the posi- tion shown, connect the Upper Wire Harness (42) to the Lower Wire Harness (43). Gently pull the upper end of the Upper Wire Harness to remove any slack from the Wire Harnesses.
Slide the Upright (2) onto the top of the Frame (1) as shown. Attach the Upright with three M8 x 19mm Button Screws (40) and three M8 Split Washers (55).
Be careful to avoid pinching the Wire Harnesses (42, 43).
2 |
|
|
|
76 |
|
|
|
| 15 |
|
|
|
| 1 |
|
|
|
| 72 |
3 |
|
|
|
|
| 27 | |
|
|
| 40 |
|
|
| 55 |
|
|
| 52 |
26 | 1 |
|
|
|
|
| |
4 |
|
|
|
Make sure the |
|
| |
wire harnesses |
|
| |
| do not get |
|
|
pinched and |
| 2 | |
damaged during | |||
| this step. |
|
|
| 40 | 42 |
|
| 43 |
| |
|
|
| |
| 55 |
| 40 |
|
|
| 55 |
| 40 | 55 | 1 |
|
|
5