CABLE ASSEMBLY
23.Route the Long Cable (72) around the 3 1/2Ó Pulley (15) on the Top Frame (55). Tighten the 3/8Ó Nylon Locknut (21) and the 3/8Ó x 2Ó Bolt (not shown).
See inset drawing. Wrap the Long Cable (72) around a 3 1/2Ó Pulley (15). Attach the Pulley and a Cable Trap (66) to the bracket on the Stabilizer (5) with a 3/8Ó x 2Ó Bolt (12) and a 3/8Ó Nylon Locknut (21). Be sure that the
Cable Trap is turned to hold the Cable in place.
24.Wrap the Long Cable (72) around a 3 1/2Ó Pulley (15). Attach the Pulley and a Cable Trap (66) to the Squat Arm (84) with the 3/8Ó x 2 1/4Ó Bolt (94) and a 3/8Ó Jam Nut (92). Be sure that the 3/8Ó Jam Nut is on the side shown and that the Cable Trap is posi- tioned to hold the Cable in place.
12
23 |
|
|
|
55 |
|
|
|
15 |
|
|
|
21 |
|
|
|
|
|
| 72 |
|
| 12 |
|
| 72 | 66 | 15 |
|
| ||
|
|
| |
|
| 5 |
|
|
|
| 21 |
|
| 15 |
|
|
| 5 |
|
|
| 21 |
|
24 |
|
|
|
66 | 15 |
|
|
94 |
|
|
|
|
|
| 84 |
|
| 92 |
|
|
| Bracket |
|
|
| 72 |
|