12. Insert an M10 x 19mm Bolt (102) into the bracket | 12 |
| |
on the Weight Carriage (62) from the side shown. | 102 | ||
| |||
Slide the Weight Carriage (62) onto the Weight | 62 |
| |
Guide Upright (42) so that the weight tube is |
|
| |
toward the Center Upright (45). |
|
| |
| Weight |
| |
| Tube |
| |
|
| 42 | |
| 45 |
| |
13. Attach the Weight Guide Top Frame (49) to the | 13 |
| |
Weight Guide Upright (42) with two M10 x 75mm |
| ||
32 | |||
Bolts (92), four M10 Washers (35), and two M10 | |||
|
| ||
Nylon Locknuts (34). Do not tighten the |
|
| |
Locknuts yet. |
|
| |
Attach the Weight Guide Top Frame (49) to the | 49 | 35 | |
Center Top Frame (46) with two M10 x 78mm |
|
| |
Bolts (32) and two M10 Nylon Locknuts (34). | 34 | 35 | |
| |||
Tighten the M10 Nylon Locknuts (34) used in |
| 35 | |
| 92 | ||
steps | 46 | ||
|
| 35 | |
| 34 | 42 | |
|
| ||
|
| 34 | |
14. Attach the Butterfly Bracket (55) to the Center | 14 |
| |
Upright (45) with two M10 x 78mm Bolts (32), two |
| ||
|
| ||
M10 Washers (35), and two M10 Nylon Locknuts |
|
| |
(34). |
|
| |
|
| 35 | |
| 32 |
| |
| 55 | 34 | |
| 35 | ||
|
| ||
| 32 |
| |
|
| 45 | |
| 11 |
|