Weider WEBE37340 user manual

Page 13

18. Route the Medium Cable (69) over a Pulley (87)

18

 

 

 

and down through the Weight Guide Top Frame

 

 

 

 

 

 

 

(49). Attach the Pulley inside the Top Frame with

34

 

 

 

an M10 x 75mm Bolt (92), two M10 Washers

35

87

49

(35), two 17mm Spacers (89), and an M10 Nylon

 

89

 

 

Locknut (34).

 

 

 

 

 

 

 

 

 

 

 

89

 

69

 

 

35

 

 

 

 

92

19. Wrap the Medium Cable (69) under a Pulley (87).

19

 

 

 

Attach the Pulley and a Cable Trap (88) to the

 

 

 

 

 

 

 

indicated hole in the Pulley Plates (82) with an

 

 

 

 

M10 x 45mm Bolt (33) and an M10 Nylon Locknut

 

 

 

 

(34). Make sure the Cable Trap is oriented to

 

 

 

 

hold the Cable in the groove of the Pulley.

34

69

 

 

 

 

87

 

 

 

 

 

 

 

88

 

 

 

82

33

 

 

 

 

 

20. Route the Medium Cable (69) up through the

20

 

 

 

Weight Guide Top Frame (49), over a Pulley (87),

 

 

 

 

 

 

 

and back down through the Top Frame. Attach

 

 

87

 

the Pulley inside the Top Frame with an M10 x

 

 

 

34

69

49

 

75mm Bolt (92), two M10 Washers (35), two

 

 

 

17mm Spacers (89), and an M10 Nylon Locknut

35

 

 

 

89

 

 

 

(34).

 

89

 

 

 

 

 

 

 

 

 

 

 

 

92

 

 

 

35

 

21. Attach the Medium Cable (69) to the M10 x

21

 

 

 

19mm Bolt (102) in the Weight Carriage (62) with

69

 

 

 

 

 

an M10 Nylon Locknut (34).

 

 

 

 

 

 

 

 

 

34

 

102

 

 

62

 

 

13

Image 13
Contents Model No. WEBE37340 Serial No QUESTIONS?Customer HOT Line Table of Contents Decal Misuse of this product may result in serious injuryImportant Precautions Right Side Before YOU BeginLeft Side Make Things Easier for Yourself AssemblyLocknuts yet Repeat this step with the Right Base not Shown Holes Page Tighten the Locknuts yet Locknuts yet Tighten the M10 Nylon Locknuts 34 used Steps Locate the Medium Cable 69. Route the Cable Caps 80. Do not overtighten the LocknutPage Locate the Butterfly Cable 31. Lubricate an Cooling Down Muscle ChartStaying Motivated Exercise Guidelines Is shown pulled away from the Center Upright for clarity Do not tighten the Locknuts yet Tighten the M10 Nylon Locknuts 34 used in steps Bracket Frames must be able to pivot easilyAssemble two Pad Tubes 27 to the Leg Lever Same manner Page Adjusting the Backrest AdjustmentsAdding Weight to the Weight Carriage or Barbell Attaching the Accessories Adding Weight to the LEG LeverAttaching the LEG Lever or Curl PAD Setting UP for Squat Exercises Using the Weight Rests and Safety SpottersTightening the Cables Knobs 22 are fully tightenedOr bind the cables Medium Cable Cable DiagramsButterfly Cable Long CableDate Exercise Weight Sets RepsAerobic Exercise Thursday Aerobic Exercise DateMonday Part Identification CHART-Model No. WEBE37340 R0704A M10 x 68mm Bolt Qty Description Part LIST-Model No. WEBE37340Exploded DRAWING-Model No. WEBE37340 R0704A Limited Warranty Ordering Replacement PartsIcon Health & FITNESS, INC., 1500 S W., LOGAN, UT