Weider WESY75742 user manual Do not tighten the Locknut yet, Do not tighten the Bolt yet

Page 9

8.

Attach a Large Pulley (14) and the Pulley Plate

8

 

 

 

 

 

(68) to the Upright (2) with an M12 x 62mm

 

 

 

 

 

Button Bolt (81) and an M12 Nylon Locknut (13).

 

 

68

13

 

 

Do not tighten the Locknut yet.

 

 

 

 

 

 

 

14

 

 

 

 

81

 

2

 

 

9.

Pull the Upper Cable (121), which is attached

9

 

 

 

 

 

inside of the Mech Frame (not shown), up

 

 

 

 

 

between the Upright (2) and the Pulley Plate (68).

 

 

 

11

121

 

Attach another Large Pulley (14) to the Upright (2)

 

 

90

 

and Pulley Plate (68) with an M12 x 62mm Button

 

 

 

 

 

Bolt (81) and an M12 Nylon Locknut (13). Make

 

 

13

 

 

 

sure that the Upper Cable (121) is between the

 

 

 

 

 

two Pulleys.

81

 

68

14

 

 

Hold the 38mm Spacer (90) inside the loop of the

 

 

 

Upper Cable (121), and between the Upright (2)

 

 

2

 

 

 

and the Pulley Plate (68). Attach the Spacer with

 

 

 

 

 

 

an M10 x 58mm Button Screw (11). Make sure

 

 

 

 

 

 

the ends of the Cable do not wrap around

 

 

 

 

 

 

each other below the Spacer and the Large

 

 

 

 

 

 

Pulleys (14) used in steps 8 and 9 (refer to the

 

 

 

 

 

 

CABLE DIAGRAM on page 18).

 

 

 

 

 

 

Tighten the M12 Nylon Locknuts (13) used in

 

 

 

 

 

 

steps 8 and 9.

 

 

 

 

 

10.

Attach a Small Guide Spacer (18), a Large Guide

10

 

 

 

 

 

Spacer (17), and two Crossbar Guides (15) to the

 

 

 

 

 

Upright (2) with an M10 x 152mm Bolt (86).

 

 

 

 

 

 

Pull the Upper Cable (121) up between the

 

17

 

 

 

 

Crossbar Guides (15). Press the metal cover on

18

86

 

 

the Cable into the groove in the Crossbar Block

 

 

 

(16). Attach a Small Guide Spacer (18), the

 

15

Metal

 

 

 

Crossbar Block, the two Crossbar Guides (15), an

 

54

 

 

M10 Thick Washer (54), and the two Tethers (70)

2

121

Cover

 

 

to the Upright (2) with another M10 x 152mm Bolt

 

 

 

86

 

(86). Do not tighten the Bolt yet.

 

 

 

70

 

 

18

16

Groove

 

 

 

 

 

 

 

9

 

 

 

 

Image 9
Contents Model No. WESY75742 Serial No QUESTIONS?Table of Contents Keep hands and fingers clear of this area Important Precautions Before YOU Begin Assembly Make Things Easier for Yourself Tighten all parts as you assemble them, unless Tighten the 1/2 x 25mm Screw Push the excess Upper Wire Harness 71 into Is Turned onUpright Do not tighten the Locknut yet Sure that the Upper Cable 121 is between Two PulleysDo not tighten the Bolt yet That the Cable is routed as shown Cable Diagram on Make sure the hexagonal hole in the Screw isOn the outside of the Bracket Described in Console Operation on Inset drawingUpper Cable Adjustment Adjustments Using the LEG LeverEnted as shown when attaching it to the Leg Adjusting the Squat ARM Adjusting the BackrestAttaching the Squat Station Attaching the Accessories Adjusting the SeatStoring the Resistance System Console Operation Features of the ConsolePlugging in the Resistance System Manual OperationProgram Operation Upper Cable Cable DiagramCleaning the BAR Guides TroubleshootingAdjusting the Resistance Recalibrating the ConsoleWarming UP Exercise GuidelinesWorking OUT Exercise FormMuscle Chart Cooling DownStaying Motivated Weight Sets Reps Thursday Aerobic Exercise Exercise Weight Sets RepsDate Aerobic ExerciseMonday Key No. Qty Description Key No. QtyPart Identification CHART-Model No. WESY75742 Exploded DRAWING-Model No. WESY75742 Ordering Replacement Parts Limited WarrantyIcon Health & FITNESS, INC., 1500 S W., LOGAN, UT