Weider WESY5993.2 user manual Locate the Long Cable 80. Insert one end

Page 10

15. Slide the Leg Developer (19) into the Bench Rail

15

 

 

 

 

 

(5). Align the hole in the Leg Developer with a

 

 

 

 

 

hole in the Front Leg (6). Tighten the Bench Knob

 

7

 

 

 

 

(42) into the hole in the Leg Developer.

 

19

 

 

 

Connect the eyebolt on the Leg Lever Cable (32)

 

 

 

 

 

to the indicated side of the Leg Lever (7) with a

65

 

 

 

 

 

5/16” Nylon Locknut (65).

 

 

 

 

 

 

 

Eyebolt

 

 

 

 

 

 

5

32

42

 

 

 

 

 

6

 

 

 

 

16. Locate the Long Cable (80). Insert one end of

16

 

 

 

 

 

the Cable through the welded tube on the indicat-

 

 

 

 

 

ed end of the Cross Tube (11) and then through a

 

 

 

80

 

 

Swivel Arm (22). If necessary, use the tip of a

 

 

 

71

screwdriver to pull the end of the Cable out of the

 

 

11107

Swivel Arm. Make sure the Cable is on the indi-

 

 

 

 

cated side of the welded rod in the Swivel Arm.

 

 

 

 

 

22

Insert the Swivel Arm (22) into the welded tube

 

 

28

 

 

on the Cross Tube (11). Secure the Swivel Arm

 

 

 

 

Rod

with a #8 x 3/8” Screw (107).

 

 

 

 

76

Wrap the Long Cable (80) around a 90mm Pulley

 

 

 

 

 

(28). Attach the Pulley inside of the Swivel Arm

 

 

 

 

 

 

(22) with a 3/8” x 1 1/2”

Button Bolt (71) and a

 

 

 

 

 

 

3/8” Nylon Locknut (76).

 

17

 

 

 

 

 

17. Wrap the Long Cable (80) around a 90mm Pulley

 

Flat

 

 

 

(28). Attach the Pulley and a Pulley Guard (29) to

 

 

Edge

29

76

 

the indicated 3/8” x 5 1/2” Carriage Bolt (73) with

 

 

 

a 3/8” Nylon Locknut (76). Make sure the flat

 

 

 

 

 

80

edge of the Pulley Guard is on the side shown.

 

73

 

 

 

 

 

 

 

 

28

 

 

 

 

 

 

18. Attach a Pulley Housing (94) to the indicated “U”-

18

 

 

 

 

 

channel on the 10-pound Center Resistance Bar

 

 

 

 

 

(44) with a 3/8” x 4” Button Bolt (24), two Pivot

 

 

 

 

 

 

Bushings (74), and a 3/8” Nylon Locknut (76).

 

44

 

 

 

 

Wrap the Long Cable (80) around a 90mm Pulley

 

 

 

 

 

(28). Attach the Pulley inside of the Pulley

 

76

 

 

 

 

Housing (94) with a 3/8” x 1 1/2” Button Bolt (71)

 

 

“U”-Channel

and a 3/8” Nylon Locknut (76).

 

74

 

 

 

 

71

94

76

 

 

 

 

 

28

 

 

 

 

 

 

74

 

 

 

 

 

 

80

24

 

 

 

 

 

10

 

 

 

 

 

Image 10
Contents QUESTIONS? Model No. WESY5993.2 Serial NoTable of Contents Important Precautions Assembled Dimensions Before YOU BeginAssembly Make Things Easier for YourselfLocknuts 69. Make sure the slot in the Knob Insert a bolt into the top hole in the Foot Plate YetIs aligned with the slot in the Seat Carriage See the inset drawing. Thread the Hook Ends of the Cable onto the HookMake sure that the Eyebolts 34 are oriented Must be able to pivot easily Do not overtighten the Locknut the Leg LeverOn the Leg Developer Swivel Arm. Make sure the Cable is on the indi Locate the Long Cable 80. Insert one endEdge of the Pulley Guard is on the side shown Make sure the flat edge of the Pulley Guard is On the bottom Page Adjusting the Seat AdjustmentsAttaching the High Pulleys and LEG Lever Attaching the Accessories Adjusting the ResistanceAdjusting the Backrest Storing the Resistance SystemAdjusting the LEG Developer Cable DiagramUsing the Removable Resistance Bars Make sure the rings are pushed against the TrayWarming UP Exercise GuidelinesPersonalizing Your Exercise Program Working OUTCooling Down Muscle ChartStaying Motivated Aerobic Exercise DateExercise Resistance Sets Reps WednesdayPart Identification Chart Nylon Locknut Part LIST-Model No. WESY5993.2 Qty DescriptionExploded DRAWING-Model No. WESY5993.2 Limited Warranty Ordering Replacement PartsIcon Health & FITNESS, INC., 1500 S W., LOGAN, UT