Installation
Unpacking
All transit bolts and packing must be removed before using the appliance.
You are advised to keep all transit devices so that they can be refitted if the machine ever has to be transported again.
1.After removing all the packaging, carefully lay machine on it’s back to remove the polystyrene base from the bottom.
2.Remove the power supply cable and the draining and inlet hose from the hose holders on the rear of the appliance.
3.Unscrew the three bolts.
4.Slide out the relevant plastic spacers.
29