Maytag MAT12PDD, MAT12PSB, MAT12PRB, MAT12PRA manual Tub Cover, Front Panel, Balance Ring, Top Cover

Page 22

Disassembly Procedures

!WARNING

Note: If the fit between the right hinge ball and the lid is so tight you cannot press it into position with the right thumb, carefully strike the right corner of the lid with the palm of the hand to snap it into position.

To avoid risk of electrical shock, personal injury or death; disconnect power to unit before servicing.

Tub Cover

1.Disconnect power supply to unit.

2.Secure Lid to the Top cover.

3.Remove Front Panel.

4.Remove screw securing Top cover to the cabinet.

5.Tilt Top backwards.

6.Remove tub cover by unsnapping the tabs securing Tub Cover to the Outer Tub.

Front Panel

1.Disconnect power supply to unit.

2.Remove two T-25H Torx screws securing front panel.

3.Pull front panel up and away from the bottom.

Balance Ring

1. Disconnect power supply to unit.

2. Remove Tub Cover.

3. Insert a pencil or other small pin through the three small holes in the outer tub depressing the tabs on the Balance Ring.

Top Cover

1.Disconnect power supply to unit.

2.Remove Front Panel.

3.Remove two top cover bolts and tilt Top Cover back.

Note: Hold lid closed or tape lid to the Top Cover to prevent it from striking the Control Panel.

22

16022842 Rev. 0

©2003 Maytag Appliances Company

Image 22
Contents Service Recognize Safety Symbols, Words, and Labels Important InformationTable of Contents Important Safety Information Related Publications Electrical Service InformationAbout Ground Wires Proper Grounding and Polarization of 120 Volts Wall OutletsGrounding Instructions ExplanationGeneral Information ServiceParts and Accessories Model IdentificationFill Water Level Control Pressure SwitchHOW IT Works Water Valve Non-ThermostaticHelical Drive Drive MotorTransmission Spin cycle completedTools for Servicing Part Number DescriptionTroubleshooting Procedures Mechanical TroubleshootingPump Belt Adjustment Drive Lug AdjustmentDamper Pad Noise Electrical Troubleshooting Component Testing Motor TestingWindings Wiring Harness Connections Readings Agitation SpinControl Panel MN Manual Model TimerCS Coin Slide Model Timer Control Board MicroprocessorTransformer Cycle Selector SwitchTouch pad Motor Run RelayLid Switch Assembly Prior series Lid Switch Assembly After seriesIndicator Light Timer models Reversing Motor RelayReinstalling Lid Switch Pressure SwitchUnbalance Lever and Plunger Assembly Air DomeCoin Drop Acceptor Water ValveCoin Slide Meter CaseReinstalling the Lid Service Door SwitchCoin Vault Switch Coin SensorBalance Ring Tub CoverFront Panel Top CoverInner Tub Access PlugAgitator Tub CenteringOuter Tub Reinstalling Mounting StemMounting Stem Tub BearingReinstalling tub bearing TransmissionReinstalling Lip Seal Lip SealDamper Assembly Brake Package and Radial BearingDrive Pulley and Rotor Bearing BeltsPump Drive Motor and Motor Base