ADC AD-170SE installation manual Dryer Enclosure Requirements

Page 17

C. DRYER ENCLOSURE REQUIREMENTS

Even though a 12-inch (30.48 cm) clearance is acceptable, it is recommended that the rear of the dryer be positioned approximately 24-inches (60.96 cm) from the nearest obstruction (i.e., wall) for ease of installation, maintenance, and service. Bulkheads and partitions should be made from noncombustible materials. The clearance between the bulkhead header and the dryer must be a minimum of 4-inches (10.16 cm) and must not extend more than 4-inches (10.16 cm) to the rear of the front. A 2-inch (5.08 cm) clearance is required between the bulkhead facing and the top of the dryer.

NOTE: Bulkhead facing should not be installed until after the dryer is in place. Ceiling area must be located a minimum of 12-inches (30.48 cm) above the dryer top console (module) and 18-inches (45.72 cm) for steam models.

NOTE: When fire sprinkler systems are located above the dryers, a minimum of 18-inches (45.72 cm) above the dryer console (module) is required. Dryers may be positioned sidewall to sidewall, however, 1 or 2-inches (2.54 or 5.08 cm) is suggested for ease of installation and maintenance. Allowances must be made for the opening and closing of the control door and the lint door.

13

Image 17
Contents AD-170SE Installation Manual Retain This Manual In a Safe Place For Future Reference For Your Safety Page Table of Contents Section Procedure for Functional Check Receiving and Handling Important InformationWhat to do if YOU Smell GAS Safety PrecautionsStandards Specifications SPECIFICATIONS/COMPONENT IdentificationSpecifications Gas and Steam Component Identification Page Location Requirements Installation ProceduresUNPACKING/SETTING UP Page Dryer Enclosure Requirements Fresh AIR Supply Requirements General Exhaust Ductwork Information Exhaust RequirementsAnywhere Downstream of the Dryer Page Page Page Page Electrical Information GAS and Steam Page Page GAS Information Type of GAS Page Page Steam Information Operating Steam PressureSteam Damper System Compressed Air Supply Air Pressure Page Preparation for OPERATION/START-UP Preoperational Test Basket Tumbler Coating Compressed AIR Requirements Preoperational InstructionsShutdown Instructions Parts SERVICE/PARTS InformationService Returning Warranty Cards Warranty InformationWarranty Returning Warranty PartsPage Cleaning Routine MaintenanceSteam Dryers Lubrication AdjustmentsDual Timer Manual Reset Burner HI-LIMIT InstructionsPhase Data Label Information Timing Legend Reversing Timer SPIN/DWELLADJUSTMENTSProcedure for Functional Check Replacement Components Page Sensoractivated Fire Extinguishing S.A.F.E. System InstallationTypical water supply Optional Manual Bypass F.E. System Theory of Operation System ResetNON-COIN S.A.F.E. System Check Procedure Page ADC Part No 12 01/23/09