ADC AD-170SE installation manual

Page 23

The ductwork should be smooth inside with no projections from sheet metal screws or other obstructions, which will collect lint. When adding ducts, the duct to be added should overlap the duct to which it is to be connected. ALL ductwork joints must be taped to prevent moisture and lint from escaping into the building. Inspection doors should be installed at strategic points in the exhaust ductwork for periodic inspection and cleaning of lint from the ductwork.

NOTE: When the exhaust ductwork passes through a wall, ceiling, or roof made of combustible materials, the opening must be 2-inches (5.08 cm) larger than the duct (all the way around). The duct must be centered within this duct.

a.Outside Ductwork Protection

1)To protect the outside end of the horizontal ductwork from the weather, a 90° elbow bent downward should be installed where the exhaust exits the building. If the exhaust ductwork travels vertically up through the roof, it should be protected from the weather by using a 180° turn to point the opening downward. In either case, allow at least twice the diameter of the duct between the duct opening and the nearest obstruction.

IMPORTANT: DO NOT use screens, louvers, or caps on the outside opening of the exhaust ductwork.

19

Image 23
Contents AD-170SE Installation Manual Retain This Manual In a Safe Place For Future Reference For Your Safety Page Table of Contents Section Procedure for Functional Check Receiving and Handling Important InformationWhat to do if YOU Smell GAS Safety PrecautionsStandards Specifications SPECIFICATIONS/COMPONENT IdentificationSpecifications Gas and Steam Component Identification Page Location Requirements Installation ProceduresUNPACKING/SETTING UP Page Dryer Enclosure Requirements Fresh AIR Supply Requirements General Exhaust Ductwork Information Exhaust RequirementsAnywhere Downstream of the Dryer Page Page Page Page Electrical Information GAS and Steam Page Page GAS Information Type of GAS Page Page Steam Information Operating Steam PressureSteam Damper System Compressed Air Supply Air Pressure Page Preparation for OPERATION/START-UP Preoperational Test Basket Tumbler Coating Compressed AIR Requirements Preoperational InstructionsShutdown Instructions Parts SERVICE/PARTS InformationService Returning Warranty Parts Warranty InformationReturning Warranty Cards WarrantyPage Cleaning Routine MaintenanceSteam Dryers Lubrication AdjustmentsDual Timer Manual Reset Burner HI-LIMIT InstructionsPhase Data Label Information Timing Legend Reversing Timer SPIN/DWELLADJUSTMENTSProcedure for Functional Check Replacement Components Page Sensoractivated Fire Extinguishing S.A.F.E. System InstallationTypical water supply Optional Manual Bypass F.E. System Theory of Operation System ResetNON-COIN S.A.F.E. System Check Procedure Page ADC Part No 12 01/23/09