The main duct may be any shape or cross-sectional area, so long as the minimum cross section area is provided. The illustrations on page 20 show the minimum cross section area for multiple dryer round or square venting. These figures must be increased 10 square inches when rectangular main ducting is used, and the ratio of duct width to depth should not be greater than 3-1/2 to 1. These figures must be increased in proportion if the main duct run to the last dryer to where it exhausts to the outdoors is unusually long (over twenty [20] feet) or has numerous elbows (more than two [2]) in it. In calculating duct work size, the cross section area of a square or rectangular duct must be increased twenty percent (20%) for each additional twenty (20) feet. The diameter of a round exhaust must be increased ten percent (10%) for each additional twenty (20) feet. Each 90° elbow is equivalent to an additional forty (40) feet, and each 45° elbow is equivalent to an additional twenty (20) feet.

IMPORTANT: For extended duct work runs, the cross section area of the duct work can only be increased to an extent. Maximum proportional duct work runs cannot exceed twenty

(20)feet more than the original limitations of twenty (20) feet with two (2) elbows. When the duct work approaches the maximum limits as noted in this manual, a professional HVAC firm should be consulted for proper venting information.

IMPORTANT: Exhaust back pressure measured by a manometer at each dryer exhaust duct area should not exceed 0.3 inches of water column.

The duct should be smooth inside with no projections from sheet metal screws or other obstructions which will collect lint. When adding ducts, the duct to be added should overlap the duct to which it is to be connected. ALL duct work joints must be taped to prevent moisture and lint from escaping into the building. Inspection doors should be installed at strategic points in the exhaust duct work for periodic inspection and clean-out of lint from the duct work.

NOTE: Where the exhaust passes through a wall, ceiling, or roof made of combustible materials, the opening must be 2-inches larger (all the way around) than the duct. The duct must be centered within this opening.

a.Outside Duct Work Protection

1)To protect the outside end of horizontal duct work from the weather, a 90° elbow bent downward should be installed where the exhaust exits the building. If the exhaust duct work travels vertically up through the roof, it should be protected from the weather by using a 180° turn to point the opening downward. In either case, allow at least twice the diameter of the duct between the duct opening and nearest obstruction.

IMPORTANT: DO NOT use screens, louvers, or caps on the outside of opening of exhaust duct work.

19

Image 23
Contents Maytag Co MD-170 Installation/Operators ManualRetain This Manual In a Safe Place For Future Reference For Your Safety Page Table of Contents Section Procedure for Functional Check of Replacement Important Information SectionWhat to do if YOU Smell GAS Safety PrecautionsGAS Supply or the Steam Supply Before ANY Covers or Specifications GAS and Steam Specifications / Component IdentificationSpecifications MDG-170 Gas MDS-170 Steam Component Identification Page Location Requirements Installation ProceduresUNPACKING/SETTING UP Round duct can now be connected to the dryer Dryer Enclosure Requirements Fresh AIR Supply Create a Potential Fire Hazard Exhaust RequirementsPage Page Page Page Page Electrical Information MDG-170 Gas MDS-170 Steam Page Page GAS Information Type of GAS Latest Edition Page Steam Requirements High Pressure Steam InformationSteam Damper System 621 kPa DiagramPage Preparation for OPERATION/START-UP Switch Otherwise the Dryer will not StartPreoperational Tests Natural Gas Inches W.C .5 millibars Basket Coating Shut Down Instructions621 kPa Compressed AIR RequirementsParts SERVICE/PARTS InformationService Returning Warranty Cards Warranty InformationClean the lint drawer or screen every third or fourth load Routine MaintenanceCleaning Createa Potentialfire Hazard Lubrication AdjustmentsDrive motor is not operating does not start TroubleshootingFailed blower impellor/fan drive shaft bearings Blower impellor/fan motor is not operating does not startFailed microprocessor controller computer Failed keyboard touchpad label assembly GAS Models Steam Models Dryer operates but is taking too long to dry Gas Models Condensation on main door glass AA. Excessive noise and/or vibration Dryer or scraping noise at tumbler basket areaFailed drive motor contactor relay Failed motor Failed blower impellor/fan drive shaft bearings Steam Models Gas Models Steam Models Condensation on main door glass Excessive noise and/or vibration Timing Legend Reversing Timer SPIN/DWELLADJUSTMENTSData Label Location / Information GAS Manifold Pressure for GAS Dryers Data LabelMicroprocessor computer Board Procedure for Functional Check Replacement ComponentsModels manufactured with ADC module Part No Theory Of Operation P O R T a N T ADC P/N114501 02/16/00-25 2- 02/25/00-250