American Dryer Corp ID-170 installation manual

Page 28

3.Electrical Connections

NOTE: A wire diagram is included with each dryer and is affixed to the back side of the top control (access) door.

The only electrical input connections to the dryer are the 3-phase (3ø) power leads (L1, L2, and L3), GROUND, and in the case of 4 wire service, the NEUTRAL. These electrical connections are made at the terminal block located in the service/relay box at the rear, upper left hand corner of the dryer. To gain access into this service box, the service cover must be removed.

The “LINE POWER” and the “GROUND” connections to the dryer must be made through the knock out hole at the top of the electric service/relay box. A strain relief must be used where the line power ground wires go into the electric service/relay box.

Providing local codes permit, power connections to the dryer can be made by use of a flexible underwriters laboratory list cord/pigtail (wire must conform to ratings of the dryer), or the dryer can be hard wired directly to the service breaker. In ALL cases, a strain relief must be used where the wire(s) enter the dryer electrical service (relay) box.

NOTE: A CIRCUIT SERVICING EACH DRYER MUST BE PROVIDED.

24

Image 28
Contents ID-170 Retain This Manual In a Safe Place For Future Reference For Your Safety Page Table of Contents Section Routine Maintenance Important Information Receiving and HandlingSafety Precautions What to do if YOU Smell GASStandards SPECIFICATIONS/COMPONENT Identification SpecificationsSpecifications Component Identification Page Installation Procedures Location RequirementsUNPACKING/SETTING UP Page Page Dryer Enclosure Requirements Fresh AIR Supply Requirements Exhaust Requirements Page Page Page Page Page Electrical Information Electrical RequirementsIDG-170 Gas IDS-170 Steam Page Page GAS Information Type of GAS Page Page Steam Information Operating Steam PressureSteam Damper System Compressed AIR Pressure Page Electric Service Exactly Preparation for OPERATION/START-UPPreoperational Tests Basket Coating Page Compressed AIR Requirements Compressed AIR Pressure AIR SupplyShut Down Instructions Service SERVICE/PARTS InformationParts Warranty Information Returning Warranty CardsWarranty Returning Warranty PartsPage Routine Maintenance CleaningSteam Dryers Adjustments LubricationReversing Timer SPIN/DWELL Adjustments Timing LegendData Label Information Data LabelSerial Number Procedure for Functional Check Replacement Components P O RTA N T ADC 113331 1 08/27/01-25