American Dryer Corp ID-170 installation manual Steam Damper System

Page 35

b.The steam supply piping to the dryer must include a 12-inch (30.48 cm) rise along with a drip trap and check valve. This will prevent any condensate from entering the steam coil.

c.Flexible hoses or couplings must be used. The dryer vibrates slightly when it runs and this will cause the steam coil connections to crack if they are hard piped to the supply and return mains.

d.Shutoff valves for each dryer should be This will allow the dryer to be isolated maintenance work.

installed in the supply line, return line, and drip trap return line. from the supply main and the return main if the dryer needs

e.Install an inverted bucket steam trap and check valve at least 12-inches (30.48 cm) below the steam coil as close to the coil as possible.

1)An inverted bucket steam trap with a capacity of 1,400 lbs (635.02 kg) of condensate per hour @ 125 PSI (8.61 bars) is required for each dryer.

f.A 3/4” (19.05 mm) vacuum breaker should be installed. This will save energy and provide for the safety of the operator and maintenance personnel.

g.Water pockets in the supply line, caused by low points, will provide wet steam to the coil possibly causing steam coil damage. ALL horizontal runs of steam supply piping should be pitched 1/4-inch (6.35 mm) for every 1 foot (0.30 meters) back towards the steam supply header causing the condensate in the line to drain to the header. Install a bypass trap in any low point to eliminate wet steam.

STEAM DAMPER SYSTEM

31

Image 35
Contents ID-170 Retain This Manual In a Safe Place For Future Reference For Your Safety Page Table of Contents Section Routine Maintenance Receiving and Handling Important InformationWhat to do if YOU Smell GAS Safety PrecautionsStandards Specifications SPECIFICATIONS/COMPONENT IdentificationSpecifications Component Identification Page Location Requirements Installation ProceduresUNPACKING/SETTING UP Page Page Dryer Enclosure Requirements Fresh AIR Supply Requirements Exhaust Requirements Page Page Page Page Page Electrical Requirements Electrical InformationIDG-170 Gas IDS-170 Steam Page Page GAS Information Type of GAS Page Page Operating Steam Pressure Steam InformationSteam Damper System Compressed AIR Pressure Page Preparation for OPERATION/START-UP Electric Service ExactlyPreoperational Tests Basket Coating Page Compressed AIR Pressure AIR Supply Compressed AIR RequirementsShut Down Instructions Parts SERVICE/PARTS InformationService Returning Warranty Parts Warranty InformationReturning Warranty Cards WarrantyPage Cleaning Routine MaintenanceSteam Dryers Lubrication AdjustmentsTiming Legend Reversing Timer SPIN/DWELL AdjustmentsData Label Data Label InformationSerial Number Procedure for Functional Check Replacement Components P O RTA N T ADC 113331 1 08/27/01-25