B. ADJUSTMENTS
7 DAYS AFTER INSTALLATION AND EVERY 6 MONTHS THEREAFTER
Inspect bolts, nuts, screws, (bearing setscrews), gounding connections, and nonpermanent gas connections (unions, shutoff valves, and orifices). Fan (impellor) V-belts, along with the motor and drive belts should be examined and replaced if necessary. Tighten loose V-belts when necessary. Complete operational check of controls and valves. Complete operational check of ALL safety devices (i.e., door switches, lint drawer switch, sail switch, burner and hi-limit thermostats).
ID-170 ONLY : Squirrel cage type fan (impellor) on the blower motor must be inspected and cleaned every six (6) months.
C. LUBRICATION
The motor bearings, the idler bearings, and the basket (tumbler) bearings are permanently lubricated.
NO LUBRICATION IS NECESSARY.
90 DAYS
Re-grease the two (2) bearings that support the impellor/fan shaft. Use Shell Alvania #2 grease or its equivalent. Impellor (fan/blower) shaft bearings should be lubricated using a #2 grease or its equivalent.