American Dryer Corp ID-170 installation manual Unpacking/Setting Up

Page 15

10. The dryer must be installed with provisions for adequate combustion and make-up air supply.

CAUTION: This dryer produces combustible lint and must be exhausted to the outdoors. Every 6 months, inspect the exhaust ducting and remove any lint build up.

B. UNPACKING/SETTING UP

Remove protective shipping material (i.e., plastic wrap, and/or optional shipping box) from dryer.

IMPORTANT: Dryer must be transported and handled in an upright position at ALL times.

The dryer can be moved to its final location while still attached to the skid or with the skid removed. To unskid the dryer, locate and remove the four (4) lag bolts securing the base of the dryer to the wooden skid. Two (2) are at the rear base, and two (2) are located in the bottom of the lint chamber. To remove the two (2) lag bolts located in the lint chamber area, remove the lint drawer and the three (3) Phillips head screws securing the lint door in place.

1.Leveling Dryer

a.To level the dryer, place 4-inch (10.16 cm) metal shims or other suitable material under the base pads. It is suggested that the dryer be tilted slightly to the rear (refer to the illustration above).

b.The V-belts are disconnected from the basket (tumbler) drive motor for shipping. Reconnect V-belts before starting the dryer.

11

Image 15
Contents ID-170 Retain This Manual In a Safe Place For Future Reference For Your Safety Page Table of Contents Section Routine Maintenance Receiving and Handling Important InformationWhat to do if YOU Smell GAS Safety PrecautionsStandards Specifications SPECIFICATIONS/COMPONENT IdentificationSpecifications Component Identification Page Location Requirements Installation ProceduresUNPACKING/SETTING UP Page Page Dryer Enclosure Requirements Fresh AIR Supply Requirements Exhaust Requirements Page Page Page Page Page Electrical Requirements Electrical InformationIDG-170 Gas IDS-170 Steam Page Page GAS Information Type of GAS Page Page Operating Steam Pressure Steam InformationSteam Damper System Compressed AIR Pressure Page Preparation for OPERATION/START-UP Electric Service ExactlyPreoperational Tests Basket Coating Page Compressed AIR Pressure AIR Supply Compressed AIR RequirementsShut Down Instructions SERVICE/PARTS Information ServiceParts Returning Warranty Parts Warranty InformationReturning Warranty Cards WarrantyPage Cleaning Routine MaintenanceSteam Dryers Lubrication AdjustmentsTiming Legend Reversing Timer SPIN/DWELL AdjustmentsData Label Data Label InformationSerial Number Procedure for Functional Check Replacement Components P O RTA N T ADC 113331 1 08/27/01-25